IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

261

matching recommendations
Reset
NAICS 334416 Capacitor, Resistor, Coil, Transformer, and Other Inductor Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0149 # 06 Y:2015 06 2015 SHUT OFF PILOTS IN STANDBY EQUIPMENT $870 $50 Implemented
DL0149 # 07 Y:2015 07 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,930 $7,440 Implemented
DL0149 # 08 Y:2015 08 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $470 $1,430 Implemented
DL0149 # 09 Y:2015 09 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $600 $3,200 Implemented
DL0149 # 10 Y:2015 10 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $480 $1,200 Implemented
DL0149 # 11 Y:2015 11 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,290 $29,215 Not Implemented
DL0149 # 01 Y:2015 01 2015 INSULATE BARE EQUIPMENT $15,210 $630 Not Implemented
DL0149 # 02 Y:2015 02 2015 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,780 $0 Implemented
SD0492 # 06 Y:2014 06 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $531 $400 Implemented
SD0492 # 05 Y:2014 05 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $881 $1,791 Implemented
SD0492 # 04 Y:2014 04 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,731 $4,350 Implemented
SD0492 # 03 Y:2014 03 2014 INSULATE BARE EQUIPMENT $3,880 $1,527 Implemented
SD0492 # 02 Y:2014 02 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,158 $34,531 Implemented
SD0492 # 01 Y:2014 01 2014 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $153,319 $210,684 Not Implemented
MA0699 # 01 Y:2012 01 2012 INSTALL TIMERS AND/OR THERMOSTATS $25,140 $9,900 Implemented
MA0699 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,627 $104,325 Implemented
MA0699 # 03 Y:2012 03 2012 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $5,019 $24,000 Implemented
MA0699 # 04 Y:2012 04 2012 ELIMINATE/REDUCE AN OPERATION $1,855 $500 Not Implemented
MA0699 # 05 Y:2012 05 2012 USE HEAT PUMP FOR SPACE CONDITIONING $1,250 $6,500 Implemented
MA0699 # 06 Y:2012 06 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $706 $100 Implemented
MI0221 # 10 Y:2012 10 2012 INSTALL OCCUPANCY SENSORS $685 $541 Not Implemented
MI0221 # 11 Y:2012 11 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $929 $2,335 Not Implemented
MI0221 # 09 Y:2012 09 2012 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $712 $1,208 Not Implemented
MI0221 # 01 Y:2012 01 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $10,726 $1,800 Implemented
MI0221 # 03 Y:2012 03 2012 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $4,281 $11,600 Implemented