Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
252
matching recommendationsNAICS | 334416 | Capacitor, Resistor, Coil, Transformer, and Other Inductor Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BD0413 # 04 Y:2012 | 04 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,421 | $300 | Not Implemented |
BD0413 # 05 Y:2012 | 05 | 2012 | INSTALL OCCUPANCY SENSORS | $1,935 | $2,100 | Implemented |
BD0413 # 06 Y:2012 | 06 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,398 | $20 | Not Implemented |
BD0413 # 07 Y:2012 | 07 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $753 | $500 | Implemented |
BD0413 # 08 Y:2012 | 08 | 2012 | USE POWER DURING OFF-PEAK PERIODS | $555 | $20 | Not Implemented |
BD0413 # 09 Y:2012 | 09 | 2012 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $978 | $1,200 | Not Implemented |
AM0609 # 06 Y:2012 | 06 | 2012 | TURN OFF EQUIPMENT WHEN NOT IN USE | $8,600 | $0 | Not Implemented |
AM0609 # 08 Y:2012 | 08 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $120 | $40 | Not Implemented |
AM0609 # 07 Y:2012 | 07 | 2012 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $8,950 | $500 | Not Implemented |
AM0609 # 05 Y:2012 | 05 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,480 | $23,500 | Not Implemented |
AM0609 # 01 Y:2012 | 01 | 2012 | ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS | $98,005 | $5,200 | Not Implemented |
AM0609 # 02 Y:2012 | 02 | 2012 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $37,900 | $400 | Not Implemented |
AM0609 # 03 Y:2012 | 03 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $44,215 | $2,000 | Not Implemented |
AM0609 # 04 Y:2012 | 04 | 2012 | OPTIMIZE PLANT POWER FACTOR | $24,800 | $47,800 | Not Implemented |
MZ0057 # 17 Y:2010 | 17 | 2010 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $652 | $0 | Not Implemented |
MZ0057 # 12 Y:2010 | 12 | 2010 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,016 | $0 | Implemented |
MZ0057 # 13 Y:2010 | 13 | 2010 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $2,940 | $0 | Implemented |
MZ0057 # 14 Y:2010 | 14 | 2010 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $3,194 | $2,000 | Implemented |
MZ0057 # 15 Y:2010 | 15 | 2010 | USE OPTIMUM THICKNESS INSULATION | $11,828 | $5,000 | Not Implemented |
MZ0057 # 16 Y:2010 | 16 | 2010 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $52 | $50 | Implemented |
MZ0057 # 19 Y:2010 | 19 | 2010 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $19,660 | $18,000 | Implemented |
MZ0057 # 21 Y:2010 | 21 | 2010 | INSULATE BARE EQUIPMENT | $248 | $300 | Implemented |
MZ0057 # 20 Y:2010 | 20 | 2010 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $14,800 | $48,840 | Not Implemented |
MZ0057 # 02 Y:2010 | 02 | 2010 | REPLACE BROKEN WINDOWS AND/OR WINDOW SASH | $145,366 | $500,000 | Not Implemented |
MZ0057 # 18 Y:2010 | 18 | 2010 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $12,000 | $0 | Implemented |