IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

252

matching recommendations
Reset
NAICS 334416 Capacitor, Resistor, Coil, Transformer, and Other Inductor Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0413 # 04 Y:2012 04 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,421 $300 Not Implemented
BD0413 # 05 Y:2012 05 2012 INSTALL OCCUPANCY SENSORS $1,935 $2,100 Implemented
BD0413 # 06 Y:2012 06 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,398 $20 Not Implemented
BD0413 # 07 Y:2012 07 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $753 $500 Implemented
BD0413 # 08 Y:2012 08 2012 USE POWER DURING OFF-PEAK PERIODS $555 $20 Not Implemented
BD0413 # 09 Y:2012 09 2012 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $978 $1,200 Not Implemented
AM0609 # 06 Y:2012 06 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $8,600 $0 Not Implemented
AM0609 # 08 Y:2012 08 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $120 $40 Not Implemented
AM0609 # 07 Y:2012 07 2012 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $8,950 $500 Not Implemented
AM0609 # 05 Y:2012 05 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,480 $23,500 Not Implemented
AM0609 # 01 Y:2012 01 2012 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $98,005 $5,200 Not Implemented
AM0609 # 02 Y:2012 02 2012 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $37,900 $400 Not Implemented
AM0609 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $44,215 $2,000 Not Implemented
AM0609 # 04 Y:2012 04 2012 OPTIMIZE PLANT POWER FACTOR $24,800 $47,800 Not Implemented
MZ0057 # 17 Y:2010 17 2010 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $652 $0 Not Implemented
MZ0057 # 12 Y:2010 12 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $3,016 $0 Implemented
MZ0057 # 13 Y:2010 13 2010 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,940 $0 Implemented
MZ0057 # 14 Y:2010 14 2010 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $3,194 $2,000 Implemented
MZ0057 # 15 Y:2010 15 2010 USE OPTIMUM THICKNESS INSULATION $11,828 $5,000 Not Implemented
MZ0057 # 16 Y:2010 16 2010 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $52 $50 Implemented
MZ0057 # 19 Y:2010 19 2010 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $19,660 $18,000 Implemented
MZ0057 # 21 Y:2010 21 2010 INSULATE BARE EQUIPMENT $248 $300 Implemented
MZ0057 # 20 Y:2010 20 2010 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $14,800 $48,840 Not Implemented
MZ0057 # 02 Y:2010 02 2010 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $145,366 $500,000 Not Implemented
MZ0057 # 18 Y:2010 18 2010 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $12,000 $0 Implemented