IAC logo
IAC Assessment: BD0413
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0413
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2012
Principal Product Polymer polishing pads
NAICS 334416 - Capacitor, Resistor, Coil, Transformer, and Other Inductor Manufacturing
SIC 3674 - Semiconductors And Related Devices
Sales $10,000,000-$50,000,000
# of Employees 70
Plant Area (Sq.Ft.) 40,227
Annual Production 72,000 Pieces
Production Hrs. Annual 6,240
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $172,449 2,302,023 kWh $0.07
Electricity Demand $30,135 5,164 kW-months/year $5.84
Electricity Fees $3,482 - $ -
Natural Gas $19,934 2,671 MMBtu $7.46
TOTAL ENERGY COSTS $229,155
RECOMMENDED SAVINGS* $19,911 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,287
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $
01: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$3,209
Cost:
$12,000
- - - - $3,209 430 - - - - - - -
-
kWh
-
-
kW-months/year
$3,209
430
MMBtu
-
-
Tgal
-
-
$
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$5,063
Cost:
$3,690
$4,403 58,789 $660 113 - - - - - - - - $4,403
58,789
kWh
$660
113
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,599
Cost:
$3,696
$2,958 39,489 $641 110 - - - - - - - - $2,958
39,489
kWh
$641
110
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,421
Cost:
$300
$1,937 25,861 $484 83 - - - - - - - - $1,937
25,861
kWh
$484
83
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,935
Cost:
$2,100
$1,313 17,537 $622 107 - - - - - - - - $1,313
17,537
kWh
$622
107
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,398
Cost:
$20
$1,212 16,176 $186 32 - - - - - - - - $1,212
16,176
kWh
$186
32
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$753
Cost:
$500
$449 5,992 $48 8 - - - - $112 - $144 - $449
5,992
kWh
$48
8
kW-months/year
-
-
MMBtu
-
-
Tgal
$112
-
$
$144
-
$
08: 2.3137 USE POWER DURING OFF-PEAK PERIODS Savings:
$555
Cost:
$20
- - $555 95 - - - - - - - - -
-
kWh
$555
95
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
09: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER Savings:
$978
Cost:
$1,200
$(-7) (-93) $(-7) (-1) - - $1,192 210,600 $(-200) - - - $(-7)
(-93)
kWh
$(-7)
(-1)
kW-months/year
-
-
MMBtu
$1,192
210,600
Tgal
$(-200)
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$19,911
Cost:
$23,526
$12,265 163,751 $3,189 546 $3,209 430 $1,192 210,600 $(-88) - $144 - $12,265
163,751
kWh
$3,189
546
kW-months/year
$3,209
430
MMBtu
$1,192
210,600
Tgal
$(-88)
-
$
$144
-
$
TOTAL IMPLEMENTED Savings:
$6,287
Cost:
$6,296
$4,720 63,018 $1,311 224 - - - - $112 - $144 - $4,720
63,018
kWh
$1,311
224
kW-months/year
-
-
MMBtu
-
-
Tgal
$112
-
$
$144
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Ancillary Material Cost