Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
300
matching recommendationsNAICS | 334418 | Printed Circuit Assembly (Electronic Assembly) Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0186 # 04 Y:2023 | 04 | 2023 | INSTALL OCCUPANCY SENSORS | $97 | $93 | n/a |
IP0186 # 06 Y:2023 | 06 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,614 | $2,164 | n/a |
IP0186 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,473 | $71 | n/a |
IP0186 # 01 Y:2023 | 01 | 2023 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $440 | $0 | n/a |
IP0186 # 03 Y:2023 | 03 | 2023 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $5,193 | $750 | n/a |
SD0637 # 08 Y:2023 | 08 | 2023 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $1,662 | $0 | Implemented |
SD0637 # 07 Y:2023 | 07 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $788 | $1,660 | Not Implemented |
SD0637 # 05 Y:2023 | 05 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $65,827 | $115,927 | Not Implemented |
SD0637 # 06 Y:2023 | 06 | 2023 | USE BATTERY STORAGE FOR DEMAND CONTROL | $53,597 | $0 | Not Implemented |
SD0637 # 01 Y:2023 | 01 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $283 | $250 | Implemented |
SD0637 # 02 Y:2023 | 02 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $665 | $2,159 | Not Implemented |
SD0637 # 04 Y:2023 | 04 | 2023 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $6,593 | $8,642 | Not Implemented |
SD0637 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,393 | $700 | Implemented |
SD0637 # 10 Y:2023 | 10 | 2023 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $25,625 | $49,475 | Not Implemented |
SD0637 # 09 Y:2023 | 09 | 2023 | INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM | $1,900 | $2,000 | Not Implemented |
WM0201 # 05 Y:2023 | 05 | 2023 | INSTALL OCCUPANCY SENSORS | $1,042 | $195 | Not Implemented |
WM0201 # 01 Y:2023 | 01 | 2023 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $15,913 | $15,200 | Not Implemented |
WM0201 # 02 Y:2023 | 02 | 2023 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $7,589 | $2,500 | Not Implemented |
WM0201 # 03 Y:2023 | 03 | 2023 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,633 | $7,520 | Not Implemented |
WM0201 # 04 Y:2023 | 04 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,077 | $1,814 | Not Implemented |
WM0199 # 05 Y:2023 | 05 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,125 | $1,662 | Not Implemented |
WM0199 # 04 Y:2023 | 04 | 2023 | USE COMPRESSOR AIR FILTERS | $1,447 | $2,189 | Implemented |
WM0199 # 02 Y:2023 | 02 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $12,348 | $0 | Not Implemented |
WM0199 # 03 Y:2023 | 03 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,889 | $2,175 | Not Implemented |
WM0199 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $22,795 | $44,389 | Implemented |