IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

283

matching recommendations
Reset
NAICS 334418 Printed Circuit Assembly (Electronic Assembly) Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0317 # 04 Y:2012 04 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,153 $2,179 Implemented
SU0317 # 05 Y:2012 05 2012 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $12,834 $27,300 Implemented
SU0317 # 06 Y:2012 06 2012 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $228 $536 Not Implemented
BD0405 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,816 $4,065 Not Implemented
BD0405 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,415 $7,299 Implemented
BD0405 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,286 $15,356 Implemented
BD0405 # 04 Y:2012 04 2012 INSTALL OCCUPANCY SENSORS $2,161 $1,050 Implemented
BD0405 # 05 Y:2012 05 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $82 $10 Implemented
BD0405 # 06 Y:2012 06 2012 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,704 $40,000 Implemented
DL0039 # 01 Y:2009 01 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $4,047 $0 Implemented
DL0039 # 02 Y:2009 02 2009 USE "WASH-LESS" PROCESSING EQUIPMENT $4,000 $0 Implemented
DL0039 # 03 Y:2009 03 2009 ADD AREA LIGHTING SWITCHES $5,647 $3,600 Not Implemented
DL0039 # 04 Y:2009 04 2009 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,511 $263 Not Implemented
DL0039 # 05 Y:2009 05 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $248 $150 Not Implemented
DL0039 # 06 Y:2009 06 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,580 $2,450 Not Implemented
DL0039 # 07 Y:2009 07 2009 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $7,500 $4,700 Not Implemented
AM0559 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $79,100 $225,000 Implemented
AM0559 # 02 Y:2009 02 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $24,500 $0 Not Implemented
AM0559 # 03 Y:2009 03 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,800 $15 Implemented
AM0559 # 04 Y:2009 04 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $7,700 $0 Implemented
AM0559 # 05 Y:2009 05 2009 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,810 $500 Implemented
AM0559 # 06 Y:2009 06 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,245 $500 Implemented
MI0168 # 01 Y:2008 01 2008 UTILIZE A LESS EXPENSIVE COOLING METHOD $256,906 $645,000 Not Implemented
MI0168 # 02 Y:2008 02 2008 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $60,893 $2,040 Implemented
MI0168 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32,290 $43,681 Implemented