Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

34

matching recommendations
Reset
NAICS 334418 Printed Circuit Assembly (Electronic Assembly) Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0637 # 10 Y:2023 10 2023 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $25,625 $49,475 Not Implemented
SD0637 # 09 Y:2023 09 2023 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $1,900 $2,000 Not Implemented
SD0637 # 08 Y:2023 08 2023 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $1,662 $0 Implemented
SD0637 # 07 Y:2023 07 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $788 $1,660 Not Implemented
SD0637 # 06 Y:2023 06 2023 USE BATTERY STORAGE FOR DEMAND CONTROL $53,597 $0 Not Implemented
SD0637 # 05 Y:2023 05 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $65,827 $115,927 Not Implemented
SD0637 # 04 Y:2023 04 2023 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $6,593 $8,642 Not Implemented
SD0637 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,393 $700 Implemented
SD0637 # 02 Y:2023 02 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $665 $2,159 Not Implemented
SD0637 # 01 Y:2023 01 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $283 $250 Implemented
CI0007 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,880 $300 n/a
CI0007 # 08 Y:2023 08 2023 SCHEDULE USE OF ELEVATORS TO CONSERVE ENERGY $663 $0 n/a
CI0007 # 07 Y:2023 07 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $853 $0 n/a
CI0007 # 06 Y:2023 06 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,123 $836 n/a
CI0007 # 05 Y:2023 05 2023 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,887 $50 n/a
CI0007 # 04 Y:2023 04 2023 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $3,248 $4,500 n/a
CI0007 # 03 Y:2023 03 2023 USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES $4,072 $15,610 n/a
CI0007 # 01 Y:2023 01 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $52,065 $0 n/a
SD0589 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,426 $8,840 Implemented
SD0589 # 02 Y:2019 02 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $442 $0 Implemented
SD0589 # 03 Y:2019 03 2019 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $242 $120 Implemented
SD0514 # 04 Y:2015 04 2015 INSTALL OCCUPANCY SENSORS $2,376 $3,380 Implemented
SD0514 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,935 $2,000 Implemented
SD0514 # 02 Y:2015 02 2015 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $34,024 $1,200 Implemented
SD0514 # 01 Y:2015 01 2015 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $188,380 $121,434 Implemented