IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

34

matching recommendations
Reset
NAICS 334418 Printed Circuit Assembly (Electronic Assembly) Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0012 # 07 Y:2012 07 2012 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $62 $128 Implemented
WM0012 # 06 Y:2012 06 2012 AIR CONDITION ONLY SPACE NECESSARY $597 $975 Not Implemented
WM0012 # 05 Y:2012 05 2012 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,779 $4,500 Not Implemented
WM0012 # 04 Y:2012 04 2012 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,999 $5,230 Implemented
WM0012 # 03 Y:2012 03 2012 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $771 $100 Not Implemented
WM0012 # 02 Y:2012 02 2012 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,345 $375 Not Implemented
WM0012 # 01 Y:2012 01 2012 RECOVER WASTE HEAT FROM EQUIPMENT $1,304 $1,675 Not Implemented
DL0096 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,429 $30,095 Implemented
DL0096 # 02 Y:2012 02 2012 RECOVER WASTE HEAT FROM EQUIPMENT $1,176 $8,000 Implemented
DL0096 # 03 Y:2012 03 2012 KEEP EQUIPMENT CLEAN $2,296 $1,200 Implemented
DL0096 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,791 $500 Implemented
DL0096 # 05 Y:2012 05 2012 REPAIR AND ELIMINATE STEAM LEAKS $766 $270 Not Implemented
MAS028 # 02 Y:2012 02 2012 REDUCE VENTILATION AIR $22,269 $9,650 Not Implemented
MAS028 # 05 Y:2012 05 2012 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $2,762 $5,000 Implemented
MAS028 # 04 Y:2012 04 2012 RECOVER WASTE HEAT FROM EQUIPMENT $3,781 $0 Not Implemented
MAS028 # 03 Y:2012 03 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $4,815 $4,000 Implemented
MAS028 # 01 Y:2012 01 2012 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $37,819 $31,800 Implemented
MAS025 # 05 Y:2012 05 2012 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $4,171 $4,300 Implemented
MAS025 # 04 Y:2012 04 2012 INSULATE BARE EQUIPMENT $5,622 $935 Not Implemented
MAS025 # 03 Y:2012 03 2012 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $7,097 $0 Not Implemented
MAS025 # 02 Y:2012 02 2012 REDUCE VENTILATION AIR $11,105 $10,770 Not Implemented
MAS025 # 01 Y:2012 01 2012 RECOVER WASTE HEAT FROM EQUIPMENT $50,701 $22,000 Not Implemented
SU0317 # 01 Y:2012 01 2012 CONDENSE OPERATION INTO ONE BUILDING $333,000 $6,675 Implemented
SU0317 # 02 Y:2012 02 2012 PREHEAT COMBUSTION AIR WITH WASTE HEAT $1,105 $270 Not Implemented
SU0317 # 03 Y:2012 03 2012 REDUCE VENTILATION AIR $9,899 $14,092 Implemented