IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

294

matching recommendations
Reset
NAICS 334419 Other Electronic Component Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0323 # 04 Y:2005 04 2005 AIR CONDITION ONLY SPACE NECESSARY $8,095 $0 Not Implemented
NC0323 # 05 Y:2005 05 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $30,533 $0 Not Implemented
NC0323 # 06 Y:2005 06 2005 INSTALL TIMERS AND/OR THERMOSTATS $16,545 $10,648 Implemented
NC0323 # 07 Y:2005 07 2005 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $13,783 $150 Implemented
UF0361 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,815 $9 Implemented
UF0361 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,264 $1 Implemented
UF0361 # 03 Y:2005 03 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,324 $2 Implemented
UF0361 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,002 $2 Implemented
UF0361 # 05 Y:2005 05 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $1,934 $0 Implemented
UF0361 # 06 Y:2005 06 2005 RECYCLE FLUORESCENT LAMPS $574 $3 Not Implemented
UF0357 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,460 $65,755 Implemented
UF0357 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,558 $1,105 Implemented
UF0357 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,371 $1,560 Implemented
UF0357 # 04 Y:2005 04 2005 ADD AREA LIGHTING SWITCHES $571 $2,910 Not Implemented
UF0357 # 05 Y:2005 05 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $448 $0 Implemented
UF0357 # 06 Y:2005 06 2005 RECYCLE FLUORESCENT LAMPS $1,424 $3,496 Implemented
CO0552 # 01 Y:2004 01 2004 INSULATE BARE EQUIPMENT $47,960 $7,780 Not Implemented
CO0552 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,570 $620 Implemented
CO0552 # 03 Y:2004 03 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,520 $270 Not Implemented
CO0552 # 04 Y:2004 04 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $834 $560 Implemented
CO0552 # 05 Y:2004 05 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,500 $3,050 Implemented
CO0552 # 06 Y:2004 06 2004 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $14,250 $71,200 Not Implemented
CO0552 # 07 Y:2004 07 2004 RECOVER AND REUSE COOLING WATER $4,170 $20,000 Not Implemented
CO0552 # 08 Y:2004 08 2004 INSTALL OCCUPANCY SENSORS $950 $2,800 Not Implemented
SU0195 # 01 Y:2004 01 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $11,293 $0 Not Implemented