IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

288

matching recommendations
Reset
NAICS 334419 Other Electronic Component Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0165 # 01 Y:2016 01 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $33,510 $75,000 Not Implemented
TT0165 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $30,405 $88,306 Implemented
TT0165 # 03 Y:2016 03 2016 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT $4,033 $3,600 Implemented
TT0165 # 04 Y:2016 04 2016 OPERATE BOILERS ON HIGH FIRE SETTING $4,000 $12,000 Implemented
TT0165 # 05 Y:2016 05 2016 INSULATE BARE EQUIPMENT $2,310 $1,919 Implemented
TT0165 # 06 Y:2016 06 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $883 $1,500 Implemented
TT0165 # 07 Y:2016 07 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $310 $200 Implemented
OK0892 # 01 Y:2014 01 2014 RECOVER WASTE HEAT FROM EQUIPMENT $635 $689 Not Implemented
OK0892 # 02 Y:2014 02 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,055 $560 Implemented
OK0892 # 03 Y:2014 03 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,809 $7,935 Not Implemented
OK0892 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,538 $1,619 Not Implemented
OK0892 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,294 $3,969 Not Implemented
OK0892 # 06 Y:2014 06 2014 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $2,109 $2,560 Not Implemented
OK0892 # 07 Y:2014 07 2014 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $105 $28 Implemented
OK0892 # 08 Y:2014 08 2014 INSTALL TIMERS AND/OR THERMOSTATS $148 $160 Implemented
OK0892 # 09 Y:2014 09 2014 REPLACE BOILER $3,189 $14,400 Not Implemented
OK0892 # 10 Y:2014 10 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $167 $660 Implemented
OK0892 # 11 Y:2014 11 2014 RECOVER WASTE HEAT FROM EQUIPMENT $3,802 $10,000 Not Implemented
OK0892 # 12 Y:2014 12 2014 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,648 $10,200 Not Implemented
OK0892 # 13 Y:2014 13 2014 INSULATE BARE EQUIPMENT $2,848 $899 Not Implemented
LE0368 # 01 Y:2013 01 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,192 $1,280 Not Implemented
LE0368 # 02 Y:2013 02 2013 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $10,077 $800 Not Implemented
LE0368 # 03 Y:2013 03 2013 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $15,354 $800 Not Implemented
LE0368 # 04 Y:2013 04 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $72 $72 Not Implemented
LE0368 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,200 $1,000 Not Implemented