IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
NAICS 3345 Navigational, Measuring, Electromedical, and Control Instruments Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0379 # 05 Y:2020 05 2020 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,953 $5,914 Not Implemented
MI0379 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,846 $1,980 Not Implemented
MI0379 # 03 Y:2020 03 2020 USE SOLAR HEAT TO HEAT WATER $9,075 $12,000 Not Implemented
MI0379 # 02 Y:2020 02 2020 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $11,551 $2,080 Not Implemented
MI0379 # 01 Y:2020 01 2020 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $192,230 $217,000 Implemented
MI0379 # 06 Y:2020 06 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,317 $2,100 Not Implemented
MI0254 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,680 $2,160 Implemented
MI0254 # 14 Y:2014 14 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $447 $80 Implemented
MI0254 # 13 Y:2014 13 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $727 $1,660 Implemented
MI0254 # 12 Y:2014 12 2014 PAY BILLS ON TIME TO AVOID LATE FEES $1,523 $240 Implemented
MI0254 # 11 Y:2014 11 2014 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $1,914 $520 Not Implemented
MI0254 # 10 Y:2014 10 2014 INSTALL OCCUPANCY SENSORS $3,162 $800 Implemented
MI0254 # 09 Y:2014 09 2014 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $3,341 $600 Not Implemented
MI0254 # 08 Y:2014 08 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,949 $13,170 Implemented
MI0254 # 06 Y:2014 06 2014 OPTIMIZE PLANT POWER FACTOR $5,083 $7,680 Implemented
MI0254 # 05 Y:2014 05 2014 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $11,159 $2,206 Not Implemented
MI0254 # 04 Y:2014 04 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,333 $7,040 Not Implemented
MI0254 # 03 Y:2014 03 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $17,716 $3,100 Implemented
MI0254 # 02 Y:2014 02 2014 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $45,927 $80 Implemented
MI0254 # 01 Y:2014 01 2014 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $66,980 $10,999 Implemented
MI0181 # 01 Y:2009 01 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $218,599 $25,000 Implemented
MI0181 # 06 Y:2009 06 2009 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,403 $4,531 Not Implemented
MI0181 # 05 Y:2009 05 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,674 $1,210 Implemented
MI0181 # 04 Y:2009 04 2009 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $50,254 $2,000 Implemented
MI0181 # 03 Y:2009 03 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $62,935 $60,000 Not Implemented