IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

398

matching recommendations
Reset
NAICS 33451 Navigational, Measuring, Electromedical, and Control Instruments Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0063 # 02 Y:2011 02 2011 INSTALL OCCUPANCY SENSORS $2,938 $1,003 Implemented
UA0063 # 04 Y:2011 04 2011 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $28,528 $3,584 Implemented
UA0063 # 05 Y:2011 05 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $30,417 $1,000 Implemented
UA0063 # 06 Y:2011 06 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $53,363 $3,900 Implemented
UA0063 # 08 Y:2011 08 2011 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $35,465 $27,200 Implemented
MA0667 # 03 Y:2011 03 2011 MODERATE COOLING TOWER OUTLET TEMPERATURE $11,694 $10,590 Implemented
MA0667 # 04 Y:2011 04 2011 REDUCE VENTILATION AIR $8,118 $0 Implemented
MA0667 # 05 Y:2011 05 2011 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $3,023 $250 Implemented
MA0667 # 10 Y:2011 10 2011 INSTALL AUTOMATIC STACK DAMPER $729 $180 Implemented
SU0296 # 01 Y:2010 01 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $81,934 $0 Implemented
SU0296 # 04 Y:2010 04 2010 INSTALL OCCUPANCY SENSORS $758 $447 Implemented
SU0296 # 06 Y:2010 06 2010 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $79,942 $129,646 Implemented
MI0186 # 01 Y:2009 01 2009 UTILIZE A LESS EXPENSIVE COOLING METHOD $160,282 $0 Implemented
MI0186 # 02 Y:2009 02 2009 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $110,625 $4,000 Implemented
MI0186 # 04 Y:2009 04 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $56,948 $10,000 Implemented
UF0427 # 01 Y:2009 01 2009 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $587 $0 Implemented
UF0427 # 02 Y:2009 02 2009 INSTALL OCCUPANCY SENSORS $519 $837 Implemented
UF0427 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,625 $0 Implemented
UF0427 # 07 Y:2009 07 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $677 $800 Implemented
UF0427 # 09 Y:2009 09 2009 PAY UTILITY BILLS ON TIME $477 $0 Implemented
MI0181 # 01 Y:2009 01 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $218,599 $25,000 Implemented
MI0181 # 02 Y:2009 02 2009 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $143,524 $2,000 Implemented
MI0181 # 04 Y:2009 04 2009 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $50,254 $2,000 Implemented
MI0181 # 05 Y:2009 05 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,674 $1,210 Implemented
MI0181 # 07 Y:2009 07 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $310 $40 Implemented