IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

36

matching recommendations
Reset
NAICS 33451 Navigational, Measuring, Electromedical, and Control Instruments Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0591 # 03 Y:2020 03 2020 INSTALL OCCUPANCY SENSORS $4,927 $4,625 Implemented
WV0591 # 02 Y:2020 02 2020 UPGRADE CONTROLS ON COMPRESSORS $6,029 $6,375 Implemented
WV0591 # 01 Y:2020 01 2020 ADJUST BURNERS FOR EFFICIENT OPERATION $10,092 $27,700 Implemented
WV0591 # 06 Y:2020 06 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,896 $1,770 Not Implemented
WV0591 # 11 Y:2020 11 2020 INSULATE BARE EQUIPMENT $151 $373 Implemented
WV0591 # 12 Y:2020 12 2020 INSULATE BARE EQUIPMENT $98 $360 Not Implemented
WV0591 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,574 $1,468 Implemented
WV0591 # 08 Y:2020 08 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $834 $50 Not Implemented
WV0591 # 05 Y:2020 05 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,647 $958 Implemented
WV0591 # 09 Y:2020 09 2020 DEVELOP A REPAIR/REPLACE POLICY $944 $338 Implemented
WV0591 # 07 Y:2020 07 2020 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $1,752 $4,700 Implemented
WV0591 # 10 Y:2020 10 2020 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $507 $2,500 Not Implemented
LE0384 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,878 $2,080 Not Implemented
LE0384 # 10 Y:2014 10 2014 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $7,346 $551,550 Implemented
LE0384 # 09 Y:2014 09 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,397 $30,000 Implemented
LE0384 # 08 Y:2014 08 2014 INSTALL TIMERS AND/OR THERMOSTATS $3,342 $234 Implemented
LE0384 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,620 $12,950 Implemented
LE0384 # 06 Y:2014 06 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,875 $3,304 Implemented
LE0384 # 05 Y:2014 05 2014 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $46,884 $80,000 Not Implemented
LE0384 # 03 Y:2014 03 2014 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $1,284 $1,010 Not Implemented
LE0384 # 02 Y:2014 02 2014 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,272 $1,481 Implemented
LE0384 # 01 Y:2014 01 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,262 $250 Not Implemented
WV0389 # 05 Y:2009 05 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $4,461 $1,740 Not Implemented
WV0389 # 12 Y:2009 12 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,327 $0 Implemented
WV0389 # 06 Y:2009 06 2009 PREHEAT COMBUSTION AIR WITH WASTE HEAT $3,065 $8,080 Not Implemented