IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

944

matching recommendations
Reset
NAICS 33451 Navigational, Measuring, Electromedical, and Control Instruments Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0261 # 04 Y:2007 04 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $125 $0 Implemented
SU0261 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $571 $249 Implemented
SU0261 # 06 Y:2007 06 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,455 $1,114 Implemented
SU0261 # 07 Y:2007 07 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,895 $7,860 Implemented
SU0261 # 08 Y:2007 08 2007 REDUCE VENTILATION AIR $12,057 $13,919 Implemented
SU0261 # 09 Y:2007 09 2007 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $354 $630 Not Implemented
SU0261 # 10 Y:2007 10 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,800 $5,887 Implemented
SU0261 # 11 Y:2007 11 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $40 $153 Implemented
SU0261 # 12 Y:2007 12 2007 INSTALL OCCUPANCY SENSORS $368 $1,801 Implemented
SU0261 # 13 Y:2007 13 2007 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $18,169 $135,500 Implemented
UU0109 # 01 Y:2006 01 2006 OPTIMIZE PLANT POWER FACTOR $1,800 $2,220 Not Implemented
UU0109 # 02 Y:2006 02 2006 USE DEMAND CONTROLLER OR LOAD SHEDDER $24,880 $20,000 Not Implemented
UU0109 # 03 Y:2006 03 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,730 $970 Not Implemented
UU0109 # 04 Y:2006 04 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,040 $90 Not Implemented
UU0109 # 05 Y:2006 05 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $3,360 $2,960 Not Implemented
UU0109 # 06 Y:2006 06 2006 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $32,510 $249,000 Not Implemented
LE0234 # 01 Y:2006 01 2006 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $190,924 $500,000 Implemented
LE0234 # 02 Y:2006 02 2006 REPAIR OR REPLACE STEAM TRAPS $46,545 $3,000 Implemented
LE0234 # 03 Y:2006 03 2006 OPTIMIZE PLANT POWER FACTOR $21,102 $32,700 Not Implemented
LE0234 # 04 Y:2006 04 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $22,567 $1,250 Not Implemented
LE0234 # 05 Y:2006 05 2006 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $10,090 $6,000 Implemented
LE0234 # 06 Y:2006 06 2006 INSTALL OCCUPANCY SENSORS $5,320 $1,500 Implemented
LE0234 # 07 Y:2006 07 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,195 $3,490 Implemented
LE0234 # 08 Y:2006 08 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $593 $60 Implemented
NC0334 # 01 Y:2006 01 2006 INCREASE AMOUNT OF CONDENSATE RETURNED $12,388 $7,290 Not Implemented