IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

43

matching recommendations
Reset
NAICS 33451 Navigational, Measuring, Electromedical, and Control Instruments Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0241 # 03 Y:2024 03 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,075 $5,000 n/a
DL0241 # 02 Y:2024 02 2024 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $7,985 $4,420 n/a
DL0241 # 01 Y:2024 01 2024 RECOVER WASTE HEAT FROM EQUIPMENT $30,655 $117,000 n/a
DL0229 # 06 Y:2023 06 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $104,868 $500,000 Not Implemented
DL0229 # 05 Y:2023 05 2023 USE HEAT PUMP FOR SPACE CONDITIONING $2,948 $14,000 Not Implemented
DL0229 # 04 Y:2023 04 2023 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $44,923 $1,275 Not Implemented
DL0229 # 03 Y:2023 03 2023 USE OPTIMUM TEMPERATURE $8,303 $0 Not Implemented
DL0229 # 01 Y:2023 01 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $61,397 $0 Not Implemented
DL0229 # 02 Y:2023 02 2023 REDUCE VENTILATION AIR $32,353 $0 Implemented
DL0206 # 04 Y:2022 04 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $14,028 $27,352 Implemented
DL0206 # 03 Y:2022 03 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,292 $0 Implemented
DL0206 # 05 Y:2022 05 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,447 $8,852 Implemented
DL0206 # 02 Y:2022 02 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $1,866 $0 Not Implemented
DL0206 # 01 Y:2022 01 2022 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $917 $0 Implemented
DL0181 # 05 Y:2020 05 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $47,490 $87,516 Implemented
DL0181 # 06 Y:2020 06 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,150 $3,146 Implemented
DL0181 # 07 Y:2020 07 2020 RECOVER WASTE HEAT FROM EQUIPMENT $3,480 $10,375 Implemented
DL0181 # 01 Y:2020 01 2020 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $32,510 $0 Implemented
DL0181 # 02 Y:2020 02 2020 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $2,480 $1,500 Implemented
DL0181 # 03 Y:2020 03 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,540 $10,000 Not Implemented
DL0181 # 04 Y:2020 04 2020 UPGRADE CONTROLS ON COMPRESSORS $4,970 $6,500 Not Implemented
DL0162 # 01 Y:2016 01 2016 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $22,170 $0 Implemented
DL0162 # 05 Y:2016 05 2016 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,940 $510 Not Implemented
DL0162 # 06 Y:2016 06 2016 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $18,175 $10,500 Implemented
DL0162 # 07 Y:2016 07 2016 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,730 $1,820 Implemented