Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
106
matching recommendationsNAICS | 33451 | Navigational, Measuring, Electromedical, and Control Instruments Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0217 # 05 Y:2016 | 05 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $841 | $1,100 | Implemented |
MZ0217 # 04 Y:2016 | 04 | 2016 | INSTALL OCCUPANCY SENSORS | $6,607 | $3,000 | Implemented |
MZ0217 # 03 Y:2016 | 03 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23,739 | $80,500 | Implemented |
MZ0217 # 02 Y:2016 | 02 | 2016 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $27,674 | $30,000 | Not Implemented |
MZ0217 # 01 Y:2016 | 01 | 2016 | CONDENSE OPERATION INTO ONE BUILDING | $4,197 | $900 | Implemented |
MZ0218 # 01 Y:2016 | 01 | 2016 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $3,078 | $12,500 | Not Implemented |
MZ0218 # 06 Y:2016 | 06 | 2016 | INSTALL OCCUPANCY SENSORS | $1,603 | $900 | Implemented |
MZ0217 # 06 Y:2016 | 06 | 2016 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $7,627 | $20,000 | Not Implemented |
MZ0218 # 05 Y:2016 | 05 | 2016 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,810 | $0 | Not Implemented |
MZ0218 # 03 Y:2016 | 03 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,572 | $10,350 | Implemented |
MZ0218 # 04 Y:2016 | 04 | 2016 | INSTALL OCCUPANCY SENSORS | $2,293 | $900 | Implemented |
MZ0217 # 07 Y:2016 | 07 | 2016 | INSULATE BARE EQUIPMENT | $668 | $600 | Not Implemented |
MZ0218 # 02 Y:2016 | 02 | 2016 | USE PHOTOCELL CONTROLS | $2,869 | $490 | Implemented |
UA0171 # 05 Y:2016 | 05 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $577 | $540 | Implemented |
UA0171 # 01 Y:2016 | 01 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,559 | $20,740 | Not Implemented |
UA0171 # 04 Y:2016 | 04 | 2016 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,758 | $0 | Implemented |
UA0171 # 02 Y:2016 | 02 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,391 | $250 | Not Implemented |
UA0171 # 03 Y:2016 | 03 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,551 | $1,770 | Implemented |
NC0573 # 01 Y:2016 | 01 | 2016 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $2,610 | $100 | Not Implemented |
NC0573 # 02 Y:2016 | 02 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,606 | $76,556 | Implemented |
NC0573 # 03 Y:2016 | 03 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,685 | $13,453 | Implemented |
NC0573 # 04 Y:2016 | 04 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $105 | $200 | Implemented |
NC0573 # 05 Y:2016 | 05 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $219 | $100 | Implemented |
NC0573 # 06 Y:2016 | 06 | 2016 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $418 | $75 | Not Implemented |
NC0573 # 07 Y:2016 | 07 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $618 | $160 | Not Implemented |