IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

60

matching recommendations
Reset
NAICS 334510 Electromedical and Electrotherapeutic Apparatus Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0533 # 01 Y:2023 01 2023 RECOVER WASTE HEAT FROM EQUIPMENT $393 $0 n/a
SU0533 # 03 Y:2023 03 2023 PAY BILLS ON TIME TO AVOID LATE FEES $1,766 $0 n/a
SU0533 # 07 Y:2023 07 2023 INSTALL / REPAIR INSULATION ON STEAM LINES $1,097 $2,011 n/a
SU0533 # 06 Y:2023 06 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,768 $1,080 n/a
SU0533 # 05 Y:2023 05 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $79 $6 n/a
SU0533 # 02 Y:2023 02 2023 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,173 $0 n/a
SU0533 # 04 Y:2023 04 2023 DISCONNECT BALLASTS $8,707 $0 n/a
SF0504 # 02 Y:2017 02 2017 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,259 $2,279 Not Implemented
SF0504 # 04 Y:2017 04 2017 USE SOLAR HEAT TO MAKE ELECTRICTY $74,348 $373,319 Not Implemented
SF0504 # 01 Y:2017 01 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,032 $100 Implemented
SF0504 # 03 Y:2017 03 2017 INSTALL OCCUPANCY SENSORS $1,736 $7,335 Implemented
MI0290 # 12 Y:2016 12 2016 REDUCE HEAT GAIN BY WINDOW TINTING $1,443 $2,240 Not Implemented
MI0290 # 13 Y:2016 13 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,396 $3,240 Not Implemented
MI0290 # 11 Y:2016 11 2016 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,703 $1,080 Implemented
MI0290 # 10 Y:2016 10 2016 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,792 $280 Implemented
MI0290 # 09 Y:2016 09 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,622 $40 Implemented
MI0290 # 08 Y:2016 08 2016 INSTALL OCCUPANCY SENSORS $3,248 $2,165 Implemented
MI0290 # 07 Y:2016 07 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,847 $6,880 Not Implemented
MI0290 # 06 Y:2016 06 2016 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $5,225 $15,465 Not Implemented
MI0290 # 05 Y:2016 05 2016 LOWER CEILING TO REDUCE CONDITIONED SPACE $5,243 $6,421 Not Implemented
MI0290 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,730 $16,200 Implemented
MI0290 # 03 Y:2016 03 2016 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $22,761 $41,950 Not Implemented
MI0290 # 02 Y:2016 02 2016 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $50,831 $40 Implemented
MI0290 # 01 Y:2016 01 2016 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $81,253 $1,120 Implemented
MI0290 # 14 Y:2016 14 2016 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $396 $317 Implemented