Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
69
matching recommendationsNAICS | 334510 | Electromedical and Electrotherapeutic Apparatus Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0241 # 02 Y:2024 | 02 | 2024 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $7,985 | $4,420 | n/a |
DL0241 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,075 | $5,000 | n/a |
WM0226 # 05 Y:2024 | 05 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $835 | $198 | n/a |
WM0226 # 06 Y:2024 | 06 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $251 | $460 | n/a |
WM0226 # 04 Y:2024 | 04 | 2024 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $5,832 | $2,000 | n/a |
WM0226 # 03 Y:2024 | 03 | 2024 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $6,027 | $9,016 | n/a |
WM0226 # 01 Y:2024 | 01 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $31,974 | $246,400 | n/a |
WM0226 # 02 Y:2024 | 02 | 2024 | INSTALL OCCUPANCY SENSORS | $7,290 | $0 | n/a |
DL0241 # 01 Y:2024 | 01 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $30,655 | $117,000 | n/a |
SU0533 # 05 Y:2023 | 05 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $79 | $6 | n/a |
SU0533 # 03 Y:2023 | 03 | 2023 | PAY BILLS ON TIME TO AVOID LATE FEES | $1,766 | $0 | n/a |
SU0533 # 01 Y:2023 | 01 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $393 | $0 | n/a |
SU0533 # 02 Y:2023 | 02 | 2023 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $8,173 | $0 | n/a |
SU0533 # 04 Y:2023 | 04 | 2023 | DISCONNECT BALLASTS | $8,707 | $0 | n/a |
SU0533 # 07 Y:2023 | 07 | 2023 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,097 | $2,011 | n/a |
SU0533 # 06 Y:2023 | 06 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,768 | $1,080 | n/a |
SF0504 # 04 Y:2017 | 04 | 2017 | USE SOLAR HEAT TO MAKE ELECTRICTY | $74,348 | $373,319 | Not Implemented |
SF0504 # 01 Y:2017 | 01 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,032 | $100 | Implemented |
SF0504 # 02 Y:2017 | 02 | 2017 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $6,259 | $2,279 | Not Implemented |
SF0504 # 03 Y:2017 | 03 | 2017 | INSTALL OCCUPANCY SENSORS | $1,736 | $7,335 | Implemented |
MI0290 # 13 Y:2016 | 13 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,396 | $3,240 | Not Implemented |
MI0290 # 06 Y:2016 | 06 | 2016 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $5,225 | $15,465 | Not Implemented |
MI0290 # 07 Y:2016 | 07 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,847 | $6,880 | Not Implemented |
MI0290 # 08 Y:2016 | 08 | 2016 | INSTALL OCCUPANCY SENSORS | $3,248 | $2,165 | Implemented |
MI0290 # 09 Y:2016 | 09 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,622 | $40 | Implemented |