IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21

matching recommendations
Reset
NAICS 334511 Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufactur
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0215 # 08 Y:2023 08 2023 INSULATE BARE EQUIPMENT $228 $1,725 Implemented
UU0215 # 07 Y:2023 07 2023 REDESIGN PROCESS $913 $2,360 Implemented
UU0215 # 06 Y:2023 06 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,565 $1,563 Implemented
UU0215 # 05 Y:2023 05 2023 OPTIMIZE PLANT POWER FACTOR $3,212 $5,850 Implemented
UU0215 # 04 Y:2023 04 2023 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,775 $52,882 Implemented
UU0215 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,368 $27,177 Implemented
UU0215 # 02 Y:2023 02 2023 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $4,878 $48,510 Implemented
UU0215 # 01 Y:2023 01 2023 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $13,760 $120,564 Not Implemented
UU0117 # 05 Y:2017 05 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,843 $1,647 Implemented
UU0117 # 07 Y:2017 07 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $779 $1,695 Not Implemented
UU0117 # 06 Y:2017 06 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,522 $0 Not Implemented
UU0117 # 04 Y:2017 04 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $21,087 $100 Not Implemented
UU0117 # 03 Y:2017 03 2017 REDESIGN PROCESS $25,877 $35,010 Not Implemented
UU0117 # 02 Y:2017 02 2017 INSTALL SPECTRAL REFLECTORS / DELAMP $34,105 $2,426 Not Implemented
UU0117 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $57,965 $96,413 Implemented
UU0088 # 01 Y:2005 01 2005 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $51,720 $68,760 Not Implemented
UU0088 # 06 Y:2005 06 2005 OPTIMIZE PLANT POWER FACTOR $15,260 $13,990 Not Implemented
UU0088 # 05 Y:2005 05 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,940 $30,000 Not Implemented
UU0088 # 04 Y:2005 04 2005 RECOVER WASTE HEAT FROM EQUIPMENT $17,670 $19,930 Not Implemented
UU0088 # 03 Y:2005 03 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,915 $900 Not Implemented
UU0088 # 02 Y:2005 02 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $703 $6,400 Not Implemented