IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

111

matching recommendations
Reset
NAICS 334513 Instruments and Related Products Manufacturing for Measuring, Displaying, and Controlling Industrial
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UL2312 # 01 Y:2023 01 2023 INSTALL SPECTRAL REFLECTORS / DELAMP $5,925 $0 Implemented
UL2312 # 03 Y:2023 03 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $450 $0 Implemented
UL2312 # 02 Y:2023 02 2023 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $5,419 $15,000 Implemented
UL2312 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,248 $1,620 Implemented
DL0206 # 04 Y:2022 04 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $14,028 $27,352 Implemented
DL0206 # 05 Y:2022 05 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,447 $8,852 Implemented
DL0206 # 03 Y:2022 03 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,292 $0 Implemented
DL0206 # 01 Y:2022 01 2022 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $917 $0 Implemented
OK1066 # 05 Y:2022 05 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $7,555 $0 Implemented
OK1066 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,177 $23,400 Implemented
WV0604 # 09 Y:2021 09 2021 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,302 $4,100 Implemented
WV0604 # 05 Y:2021 05 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,431 $403 Implemented
WV0604 # 02 Y:2021 02 2021 INSTALL OCCUPANCY SENSORS $20,602 $23,284 Implemented
WV0604 # 04 Y:2021 04 2021 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $4,330 $1,500 Implemented
WV0604 # 06 Y:2021 06 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,500 $1,792 Implemented
WV0604 # 10 Y:2021 10 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $733 $35 Implemented
WV0604 # 07 Y:2021 07 2021 DEVELOP A REPAIR/REPLACE POLICY $1,749 $672 Implemented
WV0604 # 03 Y:2021 03 2021 INSULATE BARE EQUIPMENT $18,040 $7,122 Implemented
CO0739 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $291 $185 Implemented
CO0739 # 06 Y:2020 06 2020 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $11,090 $0 Implemented
CO0739 # 04 Y:2020 04 2020 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,067 $0 Implemented
OK0868 # 04 Y:2013 04 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,792 $1,851 Implemented
OK0868 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,347 $750 Implemented
OK0868 # 06 Y:2013 06 2013 INSTALL SET-BACK TIMERS $3,871 $606 Implemented
OK0868 # 09 Y:2013 09 2013 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $287 $456 Implemented