IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

19

matching recommendations
Reset
NAICS 335 Electrical Equipment, Appliance, and Component Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0224 # 08 Y:2019 08 2019 USE OPTIMUM THICKNESS INSULATION $3,722 $10,752 Implemented
TT0224 # 05 Y:2019 05 2019 INSTALL TIMERS AND/OR THERMOSTATS $14,353 $500 Implemented
TT0224 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,374 $16,645 Implemented
TT0224 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $24,405 $3,200 Implemented
TT0224 # 01 Y:2019 01 2019 USE DISTILLATION, EVAPORATION TO REMOVE CONTAMINANTS $119,892 $51,560 Implemented
OK0788 # 01 Y:2010 01 2010 INSTALL / REPAIR INSULATION ON STEAM LINES $285 $451 Implemented
OK0788 # 10 Y:2010 10 2010 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $15,837 $12,000 Implemented
OK0788 # 07 Y:2010 07 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $35,265 $98,109 Implemented
OK0788 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,350 $8,818 Implemented
OK0788 # 04 Y:2010 04 2010 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $3,625 $1,176 Implemented
OK0770 # 07 Y:2008 07 2008 TURN OFF EQUIPMENT WHEN NOT IN USE $16,527 $0 Implemented
OK0770 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,686 $17,885 Implemented
OK0770 # 03 Y:2008 03 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $669 $1,056 Implemented
OK0770 # 02 Y:2008 02 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,597 $0 Implemented
OK0770 # 01 Y:2008 01 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,297 $0 Implemented
OK0736 # 01 Y:2006 01 2006 INSULATE BARE EQUIPMENT $224,746 $154,440 Implemented
OK0736 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,322 $1,267 Implemented
OK0736 # 04 Y:2006 04 2006 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $8,438 $765 Implemented
OK0736 # 03 Y:2006 03 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $29,250 $20,340 Implemented