IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,189

matching recommendations
Reset
NAICS 335 Electrical Equipment, Appliance, and Component Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0218 # 06 Y:2023 06 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,861 $721 Implemented
UU0218 # 07 Y:2023 07 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $512 $161 Implemented
KS2312 # 01 Y:2023 01 2023 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $20,360 $1,600 Implemented
KS2312 # 02 Y:2023 02 2023 ISOLATE HOT OR COLD EQUIPMENT $3,369 $3,164 Not Implemented
KS2312 # 03 Y:2023 03 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,204 $0 Implemented
KS2312 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,944 $5,480 Implemented
KS2312 # 05 Y:2023 05 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $80 $89 Not Implemented
KS2312 # 06 Y:2023 06 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $8,286 $62,649 Implemented
KS2312 # 07 Y:2023 07 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $53,134 $373,105 Not Implemented
WV0637 # 01 Y:2023 01 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,145 $8,026 Not Implemented
WV0637 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,462 $188 Implemented
WV0637 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,065 $3,353 Implemented
WV0637 # 04 Y:2023 04 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $678 $50 Implemented
WV0637 # 05 Y:2023 05 2023 UPGRADE CONTROLS ON COMPRESSORS $572 $1,465 Not Implemented
WV0637 # 06 Y:2023 06 2023 DEVELOP A REPAIR/REPLACE POLICY $502 $617 Implemented
WV0637 # 07 Y:2023 07 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $164 $483 Implemented
WV0637 # 08 Y:2023 08 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $122 $600 Implemented
MZ0331 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,162 $25,757 Implemented
MZ0331 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,037 $46,350 Implemented
MZ0331 # 03 Y:2022 03 2022 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $91,773 $9,040 Implemented
MZ0331 # 04 Y:2022 04 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,985 $29,286 Implemented
MZ0331 # 05 Y:2022 05 2022 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $402,938 $1,820,000 Not Implemented
MZ0331 # 06 Y:2022 06 2022 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $31,613 $98,280 Implemented
MZ0331 # 07 Y:2022 07 2022 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $76,144 $423,000 Not Implemented
MZ0331 # 08 Y:2022 08 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $110,196 $55,220 Not Implemented