IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,095

matching recommendations
Reset
NAICS 335 Electrical Equipment, Appliance, and Component Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0558 # 07 Y:2024 07 2024 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $474 $2,500 Implemented
CW0130 # 01 Y:2024 01 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,562 $17,397 n/a
CW0130 # 02 Y:2024 02 2024 INSTALL OCCUPANCY SENSORS $4,196 $2,050 n/a
CW0130 # 03 Y:2024 03 2024 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $17,298 $8,391 n/a
CW0130 # 04 Y:2024 04 2024 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $202 $424 n/a
CW0130 # 05 Y:2024 05 2024 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $7,210 $13,000 n/a
CW0130 # 06 Y:2024 06 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $1,786 $6,750 n/a
SJ0012 # 03 Y:2024 03 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $215 $0 Not Implemented
SJ0012 # 02 Y:2024 02 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,374 $0 Not Implemented
SJ0012 # 01 Y:2024 01 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $26 $0 Not Implemented
SJ0012 # 04 Y:2024 04 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $151,265 $402,860 Not Implemented
SJ0012 # 05 Y:2024 05 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,778 $22,286 Implemented
SJ0012 # 06 Y:2024 06 2024 USE MINIMUM SAFE OVEN VENTILATION $157 $217 Not Implemented
SJ0012 # 07 Y:2024 07 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,511 $11,438 Not Implemented
IP0179 # 07 Y:2023 07 2023 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $378 $3,830 Not Implemented
IP0179 # 06 Y:2023 06 2023 USE HEAT PUMP FOR SPACE CONDITIONING $26,133 $46,106 Not Implemented
IP0179 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,534 $182 Not Implemented
IP0179 # 04 Y:2023 04 2023 INSTALL OCCUPANCY SENSORS $814 $9 Not Implemented
IP0179 # 03 Y:2023 03 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $19,788 $345 Not Implemented
IP0179 # 02 Y:2023 02 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,855 $0 Not Implemented
IP0179 # 01 Y:2023 01 2023 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $471 $0 Not Implemented
SD0645 # 08 Y:2024 08 2024 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $49,587 $0 Not Implemented
SD0645 # 07 Y:2024 07 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $520 $1,694 Not Implemented
SD0645 # 06 Y:2024 06 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,170 $3,900 Not Implemented
SD0645 # 05 Y:2024 05 2024 USE BATTERY STORAGE FOR DEMAND CONTROL $48,532 $0 Not Implemented