Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

25

matching recommendations
Reset
NAICS 335 Electrical Equipment, Appliance, and Component Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0242 # 10 Y:2024 10 2024 UPGRADE OBSOLETE EQUIPMENT $12,250 $84,300 n/a
UU0242 # 09 Y:2024 09 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $12,487 $68,600 n/a
UU0242 # 08 Y:2024 08 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,658 $13,800 n/a
UU0242 # 07 Y:2024 07 2024 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $6,520 $9,510 n/a
UU0242 # 06 Y:2024 06 2024 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $21,730 $82,100 n/a
UU0242 # 05 Y:2024 05 2024 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $8,004 $11,422 n/a
UU0242 # 04 Y:2024 04 2024 INSTALL OCCUPANCY SENSORS $5,187 $5,143 n/a
UU0242 # 03 Y:2024 03 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,164 $37,300 n/a
UU0242 # 02 Y:2024 02 2024 CLOSE OFF UNNEEDED STEAM LINES $10,220 $4,400 n/a
UU0242 # 01 Y:2024 01 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $139,774 $4,000 n/a
UU0218 # 05 Y:2023 05 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $2,944 $78,979 Not Implemented
UU0218 # 07 Y:2023 07 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $512 $161 Implemented
UU0218 # 06 Y:2023 06 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,861 $721 Implemented
UU0218 # 04 Y:2023 04 2023 DEMOLISH OLD BUILDING TO REDUCE TAX AND INSURANCE BILLS $3,088 $3,300 Not Implemented
UU0218 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,223 $53,198 Implemented
UU0218 # 02 Y:2023 02 2023 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $7,404 $5,700 Implemented
UU0218 # 01 Y:2023 01 2023 OPTIMIZE PLANT POWER FACTOR $8,860 $4,445 Not Implemented
UU0125 # 01 Y:2017 01 2017 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $32,802 $0 Not Implemented
UU0125 # 08 Y:2017 08 2017 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,690 $0 Not Implemented
UU0125 # 07 Y:2017 07 2017 MINIMIZE WATER USAGE $3,700 $200 Implemented
UU0125 # 06 Y:2017 06 2017 INSTALL OCCUPANCY SENSORS $4,418 $7,220 Implemented
UU0125 # 05 Y:2017 05 2017 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $5,417 $39,198 Not Implemented
UU0125 # 04 Y:2017 04 2017 RECOVER AND REUSE WASTE MATERIAL $6,187 $3,150 Implemented
UU0125 # 03 Y:2017 03 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,110 $20 Not Implemented
UU0125 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,851 $18,588 Implemented