IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

40

matching recommendations
Reset
NAICS 335 Electrical Equipment, Appliance, and Component Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0577 # 09 Y:2016 09 2016 TREAT AND REUSE RINSE WATERS $5,659 $7,720 Not Implemented
NC0577 # 08 Y:2016 08 2016 REPAIR AND ELIMINATE STEAM LEAKS $106 $200 Not Implemented
NC0577 # 07 Y:2016 07 2016 INSULATE BARE EQUIPMENT $168 $799 Not Implemented
NC0577 # 06 Y:2016 06 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,793 $2,000 Not Implemented
NC0577 # 05 Y:2016 05 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,896 $100 Not Implemented
NC0577 # 04 Y:2016 04 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,088 $3,600 Not Implemented
NC0577 # 03 Y:2016 03 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $819 $100 Not Implemented
NC0577 # 02 Y:2016 02 2016 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $11,227 $15,000 Not Implemented
NC0577 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $59,300 $135,630 Not Implemented
NC0400 # 05 Y:2010 05 2010 RECOVER WASTE HEAT FROM EQUIPMENT $75 $200 Implemented
NC0400 # 01 Y:2010 01 2010 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $25,103 $60,000 Not Implemented
NC0400 # 02 Y:2010 02 2010 CONVERT LIQUID HEATERS FROM UNDERFIRING TO IMMERSION OR SUBMERSION HEATING $9,007 $37,000 Implemented
NC0400 # 03 Y:2010 03 2010 RECOVER WASTE HEAT FROM EQUIPMENT $4,571 $11,072 Not Implemented
NC0400 # 04 Y:2010 04 2010 DEVELOP A REPAIR/REPLACE POLICY $1,761 $4,346 Implemented
NC0378 # 02 Y:2008 02 2008 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $56,045 $85,000 Not Implemented
NC0378 # 11 Y:2008 11 2008 USE PHOTOCELL CONTROLS $3,452 $12,000 Implemented
NC0378 # 10 Y:2008 10 2008 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $32,100 $100,000 Not Implemented
NC0378 # 09 Y:2008 09 2008 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $10,000 $1,000 Implemented
NC0378 # 08 Y:2008 08 2008 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $226,587 $37,500 Implemented
NC0378 # 07 Y:2008 07 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,481 $100 Implemented
NC0378 # 06 Y:2008 06 2008 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,591 $7,700 Implemented
NC0378 # 05 Y:2008 05 2008 RECOVER WASTE HEAT FROM EQUIPMENT $17,355 $7,450 Not Implemented
NC0378 # 04 Y:2008 04 2008 REVISE SMOKE CLEANUP FROM OPERATIONS $2,215 $7,700 Not Implemented
NC0378 # 03 Y:2008 03 2008 TURN OFF EQUIPMENT WHEN NOT IN USE $3,480 $500 Not Implemented
NC0378 # 01 Y:2008 01 2008 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $97,991 $50,000 Implemented