Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
160
matching recommendationsNAICS | 335 | Electrical Equipment, Appliance, and Component Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0206 # 04 Y:2024 | 04 | 2024 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $719 | $419 | n/a |
IP0206 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,948 | $83 | n/a |
IP0206 # 03 Y:2024 | 03 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $31,184 | $17,042 | n/a |
IP0206 # 06 Y:2024 | 06 | 2024 | USE RADIANT HEATER FOR SPOT HEATING | $1,970 | $4,748 | n/a |
IP0206 # 02 Y:2024 | 02 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,530 | $714 | n/a |
IP0206 # 05 Y:2024 | 05 | 2024 | INSTALL OCCUPANCY SENSORS | $1,174 | $877 | n/a |
CI0037 # 14 Y:2024 | 14 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,215 | $740 | n/a |
CI0037 # 01 Y:2024 | 01 | 2024 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $74,767 | $25,940 | n/a |
CI0037 # 13 Y:2024 | 13 | 2024 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,023 | $18,000 | n/a |
CI0037 # 12 Y:2024 | 12 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,140 | $860 | n/a |
CI0037 # 11 Y:2024 | 11 | 2024 | USE PHOTOCELL CONTROLS | $2,356 | $960 | n/a |
CI0037 # 10 Y:2024 | 10 | 2024 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $2,495 | $36,000 | n/a |
CI0037 # 09 Y:2024 | 09 | 2024 | INSTALL OCCUPANCY SENSORS | $3,616 | $1,575 | n/a |
CI0037 # 08 Y:2024 | 08 | 2024 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $4,373 | $50 | n/a |
CI0037 # 07 Y:2024 | 07 | 2024 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $4,500 | $2,000 | n/a |
CI0037 # 06 Y:2024 | 06 | 2024 | RECOVER AND REUSE WASTE MATERIAL | $7,648 | $8,750 | n/a |
CI0037 # 05 Y:2024 | 05 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,720 | $13,500 | n/a |
CI0037 # 04 Y:2024 | 04 | 2024 | INSULATE BARE EQUIPMENT | $11,559 | $3,600 | n/a |
CI0037 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $20,579 | $1,600 | n/a |
CI0037 # 02 Y:2024 | 02 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $35,594 | $236,068 | n/a |
MI0453 # 01 Y:2024 | 01 | 2024 | USE DISTILLATION, EVAPORATION TO REMOVE CONTAMINANTS | $43,981 | $80,000 | n/a |
MI0453 # 03 Y:2024 | 03 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,219 | $14,799 | n/a |
MI0453 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $14,805 | $1,620 | n/a |
MI0453 # 05 Y:2024 | 05 | 2024 | INSTALL OCCUPANCY SENSORS | $4,117 | $1,690 | n/a |
MI0453 # 04 Y:2024 | 04 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $8,976 | $11,882 | n/a |