Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
30
matching recommendationsNAICS | 33512 | Lighting Fixture Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0425 # 08 Y:2011 | 08 | 2011 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $1,189 | $4,200 | Not Implemented |
WV0425 # 07 Y:2011 | 07 | 2011 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,578 | $3,004 | Implemented |
WV0425 # 06 Y:2011 | 06 | 2011 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,760 | $0 | Implemented |
WV0425 # 05 Y:2011 | 05 | 2011 | ADD AREA LIGHTING SWITCHES | $5,883 | $20,000 | Not Implemented |
WV0425 # 04 Y:2011 | 04 | 2011 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $9,251 | $9,400 | Implemented |
WV0425 # 03 Y:2011 | 03 | 2011 | UPGRADE CONTROLS ON COMPRESSORS | $29,992 | $32,300 | Not Implemented |
WV0425 # 02 Y:2011 | 02 | 2011 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $128,784 | $122,980 | Not Implemented |
WV0425 # 01 Y:2011 | 01 | 2011 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $358,430 | $44,500 | Not Implemented |
LE0292 # 05 Y:2009 | 05 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,424 | $1,840 | Not Implemented |
LE0292 # 09 Y:2009 | 09 | 2009 | INSTALL OCCUPANCY SENSORS | $961 | $420 | Implemented |
LE0292 # 04 Y:2009 | 04 | 2009 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,921 | $3,000 | Implemented |
LE0292 # 03 Y:2009 | 03 | 2009 | INSTALL TIMERS AND/OR THERMOSTATS | $5,415 | $180 | Implemented |
LE0292 # 02 Y:2009 | 02 | 2009 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $11,701 | $2,700 | Not Implemented |
LE0292 # 01 Y:2009 | 01 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $29,667 | $27,000 | Implemented |
LE0292 # 06 Y:2009 | 06 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,459 | $200 | Implemented |
LE0292 # 07 Y:2009 | 07 | 2009 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,073 | $3,000 | Implemented |
LE0292 # 08 Y:2009 | 08 | 2009 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,952 | $1,000 | Not Implemented |
WV0345 # 12 Y:2006 | 12 | 2006 | DEVELOP A REPAIR/REPLACE POLICY | $5,468 | $800 | Implemented |
WV0345 # 11 Y:2006 | 11 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,570 | $0 | Not Implemented |
WV0345 # 09 Y:2006 | 09 | 2006 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $6,834 | $10,400 | Not Implemented |
WV0345 # 08 Y:2006 | 08 | 2006 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $9,402 | $1,000 | Implemented |
WV0345 # 06 Y:2006 | 06 | 2006 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $14,670 | $1,000 | Implemented |
WV0345 # 05 Y:2006 | 05 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,346 | $2,805 | Implemented |
WV0345 # 04 Y:2006 | 04 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $22,653 | $26,300 | Not Implemented |
WV0345 # 03 Y:2006 | 03 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $35,574 | $60,657 | Implemented |