IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

44

matching recommendations
Reset
NAICS 33521 Small Electrical Appliance Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0045 # 11 Y:2014 11 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,255 $1,220 Implemented
WM0045 # 10 Y:2014 10 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $38 $100 Not Implemented
WM0045 # 09 Y:2014 09 2014 COVER OPEN TANKS $51 $0 Implemented
WM0045 # 08 Y:2014 08 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $313 $630 Not Implemented
WM0045 # 07 Y:2014 07 2014 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $478 $280 Implemented
WM0045 # 06 Y:2014 06 2014 IMPROVE SPACE COMFORT CONDITIONING $4,160 $350 Not Implemented
WM0045 # 01 Y:2014 01 2014 RECYCLE WHITE WATER $6,827 $13,958 Not Implemented
WM0045 # 02 Y:2014 02 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,114 $2,500 Not Implemented
WM0045 # 03 Y:2014 03 2014 UPGRADE CONTROLS ON COMPRESSORS $2,701 $0 Implemented
WM0045 # 04 Y:2014 04 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,111 $2,030 Not Implemented
WM0045 # 05 Y:2014 05 2014 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $1,440 $940 Not Implemented
NC0449 # 06 Y:2012 06 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,521 $3,200 Not Implemented
NC0449 # 05 Y:2012 05 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,027 $6,500 Not Implemented
NC0449 # 04 Y:2012 04 2012 RECOVER WASTE HEAT FROM EQUIPMENT $7,288 $37,820 Not Implemented
NC0449 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,300 $10,168 Implemented
NC0449 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $883 $1,560 Implemented
NC0449 # 01 Y:2012 01 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $39,096 $50,000 Not Implemented
TT0071 # 07 Y:2011 07 2011 UPGRADE CONTROLS ON COMPRESSORS $4,400 $9,000 Not Implemented
TT0071 # 06 Y:2011 06 2011 RECOVER WASTE HEAT FROM EQUIPMENT $4,600 $3,000 Not Implemented
TT0071 # 05 Y:2011 05 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,900 $5,000 Not Implemented
TT0071 # 04 Y:2011 04 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,700 $5 Implemented
TT0071 # 03 Y:2011 03 2011 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $13,100 $8,000 Not Implemented
TT0071 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,400 $52,100 Implemented
TT0071 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $43,100 $66,100 Implemented
TT0034 # 05 Y:2009 05 2009 UTILIZE A LESS EXPENSIVE COOLING METHOD $13,300 $20,000 Not Implemented