IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

736

matching recommendations
Reset
NAICS 3353 Electrical Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0390 # 10 Y:2015 10 2015 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $81 $357 Not Implemented
BD0462 # 01 Y:2015 01 2015 USE RADIANT HEATER FOR SPOT HEATING $9,937 $8,800 Implemented
BD0462 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,640 $300 Implemented
BD0462 # 03 Y:2015 03 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,604 $3,500 Implemented
BD0462 # 04 Y:2015 04 2015 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $6,049 $4,000 Implemented
BD0462 # 05 Y:2015 05 2015 REPLACE BOILER $3,962 $7,604 Implemented
BD0462 # 06 Y:2015 06 2015 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,511 $1,400 Not Implemented
BD0462 # 07 Y:2015 07 2015 INSTALL OCCUPANCY SENSORS $861 $975 Not Implemented
BD0462 # 08 Y:2015 08 2015 INSTALL TURBULATORS $595 $1,160 Not Implemented
BD0462 # 09 Y:2015 09 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $396 $325 Not Implemented
BD0462 # 10 Y:2015 10 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $29 $54 Not Implemented
BD0462 # 11 Y:2015 11 2015 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $15,189 $2,000 Not Implemented
BD0462 # 12 Y:2015 12 2015 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $7,464 $6,000 Not Implemented
BD0462 # 13 Y:2015 13 2015 CONTRACT A WOOD PALLET RECYCLING COMPANY $6,060 $300 Not Implemented
NC0538 # 01 Y:2015 01 2015 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $17,825 $50,000 Not Implemented
NC0538 # 02 Y:2015 02 2015 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,806 $21,000 Not Implemented
NC0538 # 03 Y:2015 03 2015 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,306 $1,700 Not Implemented
NC0538 # 04 Y:2015 04 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,255 $20,000 Not Implemented
NC0538 # 05 Y:2015 05 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $828 $100 Implemented
NC0538 # 06 Y:2015 06 2015 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,230 $1,875 Not Implemented
NC0538 # 07 Y:2015 07 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $424 $1,767 Implemented
NC0538 # 08 Y:2015 08 2015 DEVELOP A REPAIR/REPLACE POLICY $1,483 $4,256 Not Implemented
MZ0162 # 01 Y:2014 01 2014 RECOVER WASTE HEAT FROM EQUIPMENT $1,303 $2,900 Not Implemented
MZ0162 # 02 Y:2014 02 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $657 $0 Not Implemented
MZ0162 # 03 Y:2014 03 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $537 $2,680 Implemented