Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
725
matching recommendationsNAICS | 3353 | Electrical Equipment Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0302 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $21,127 | $1,500 | n/a |
TT0302 # 08 Y:2023 | 08 | 2023 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $2,956 | $965 | n/a |
UC2306 # 09 Y:2023 | 09 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $9,865 | $22,297 | n/a |
UC2306 # 03 Y:2023 | 03 | 2023 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $375 | $0 | n/a |
UC2306 # 07 Y:2023 | 07 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $6,153 | $34,274 | n/a |
UC2306 # 05 Y:2023 | 05 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,621 | $1,600 | n/a |
UC2306 # 01 Y:2023 | 01 | 2023 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $2,520 | $0 | n/a |
UC2306 # 11 Y:2023 | 11 | 2023 | INSULATE BARE EQUIPMENT | $429 | $1,916 | n/a |
UC2306 # 10 Y:2023 | 10 | 2023 | INSTALL / REPAIR INSULATION ON STEAM LINES | $207 | $733 | n/a |
UC2306 # 08 Y:2023 | 08 | 2023 | INSTALL TIMERS AND/OR THERMOSTATS | $1,986 | $3,066 | n/a |
UC2306 # 06 Y:2023 | 06 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $70,539 | $385,242 | n/a |
UC2306 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,636 | $11,635 | n/a |
UC2306 # 12 Y:2023 | 12 | 2023 | USE HEAT PUMP FOR SPACE CONDITIONING | $20,361 | $73,450 | n/a |
UC2306 # 04 Y:2023 | 04 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $795 | $600 | n/a |
MS0414 # 03 Y:2023 | 03 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $45,723 | $532,875 | n/a |
MS0414 # 01 Y:2023 | 01 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,690 | $1,580 | n/a |
MS0414 # 04 Y:2023 | 04 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $11,747 | $144,100 | n/a |
MS0414 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,129 | $37,628 | n/a |
MZ0337 # 05 Y:2023 | 05 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,882 | $6,873 | Implemented |
MZ0337 # 02 Y:2023 | 02 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $6,106 | $2,400 | Implemented |
MZ0337 # 06 Y:2023 | 06 | 2023 | IMPROVE SPACE COMFORT CONDITIONING | $150,000 | $75,650 | Implemented |
MZ0337 # 03 Y:2023 | 03 | 2023 | USE PHOTOCELL CONTROLS | $314 | $100 | Implemented |
MZ0337 # 04 Y:2023 | 04 | 2023 | INSTALL OCCUPANCY SENSORS | $330 | $820 | Not Implemented |
MZ0337 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,895 | $9,731 | Implemented |
UU0218 # 02 Y:2023 | 02 | 2023 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $7,404 | $5,700 | Implemented |