IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

725

matching recommendations
Reset
NAICS 3353 Electrical Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TA0061 # 04 Y:2003 04 2003 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $1,870 $435 Implemented
TA0061 # 05 Y:2003 05 2003 INSTALL OCCUPANCY SENSORS $1,100 $1,730 Not Implemented
TA0061 # 06 Y:2003 06 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $690 $0 Implemented
TA0061 # 07 Y:2003 07 2003 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $400 $0 Not Implemented
TA0061 # 08 Y:2003 08 2003 INSTALL OCCUPANCY SENSORS $350 $170 Not Implemented
TA0061 # 09 Y:2003 09 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $300 $283 Implemented
TA0061 # 10 Y:2003 10 2003 DISCONNECT BALLASTS $140 $270 Not Implemented
TA0061 # 11 Y:2003 11 2003 INSULATE BARE EQUIPMENT $140 $255 Not Implemented
TA0061 # 12 Y:2003 12 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $100 $0 Not Implemented
IA0322 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,109 $783 Implemented
IA0322 # 02 Y:2003 02 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $511 $34 Not Implemented
IA0322 # 03 Y:2003 03 2003 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,475 $570 Not Implemented
IA0322 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,973 $16,562 Implemented
IA0322 # 05 Y:2003 05 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,303 $4,835 Implemented
IA0322 # 06 Y:2003 06 2003 INSTALL OCCUPANCY SENSORS $614 $399 Not Implemented
IA0322 # 07 Y:2003 07 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $174 $514 Implemented
UD0672 # 01 Y:2003 01 2003 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $7,766 $0 Implemented
UD0672 # 02 Y:2003 02 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,363 $14,700 Not Implemented
UD0672 # 03 Y:2003 03 2003 UPGRADE CONTROLS ON COMPRESSORS $2,100 $136 Implemented
UD0672 # 04 Y:2003 04 2003 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,720 $0 Not Implemented
UD0672 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,550 $143 Implemented
UD0672 # 06 Y:2003 06 2003 DISCONNECT BALLASTS $963 $323 Implemented
UD0672 # 07 Y:2003 07 2003 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $867 $0 Not Implemented
UD0672 # 08 Y:2003 08 2003 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $815 $218 Implemented
UD0672 # 09 Y:2003 09 2003 UPGRADE CONTROLS ON COMPRESSORS $495 $0 Not Implemented