IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

725

matching recommendations
Reset
NAICS 3353 Electrical Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0779 # 07 Y:2019 07 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,380 $3,300 Implemented
AM0779 # 08 Y:2019 08 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $110 $240 Not Implemented
TR0009 # 01 Y:2018 01 2018 OPTIMIZE PLANT POWER FACTOR $3,043 $12,500 Not Implemented
TR0009 # 02 Y:2018 02 2018 RECYCLE FLUORESCENT LAMPS $6,608 $13,260 Implemented
TR0009 # 03 Y:2018 03 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $814 $0 Not Implemented
TR0009 # 04 Y:2018 04 2018 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $2,987 $15,373 Implemented
TR0009 # 05 Y:2018 05 2018 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $17,718 $3,748 Not Implemented
TR0009 # 06 Y:2018 06 2018 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $1,315 $14,000 Implemented
WM0120 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $37,818 $35,678 Implemented
WM0120 # 02 Y:2018 02 2018 USE RADIANT HEATER FOR SPOT HEATING $18,564 $28,796 Not Implemented
WM0120 # 03 Y:2018 03 2018 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $13,520 $0 Not Implemented
WM0120 # 04 Y:2018 04 2018 USE SOLAR HEAT TO MAKE ELECTRICTY $13,376 $48,514 Not Implemented
WM0120 # 05 Y:2018 05 2018 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $13,335 $22,000 Not Implemented
WM0120 # 06 Y:2018 06 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,903 $5,577 Not Implemented
WM0120 # 07 Y:2018 07 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,377 $2,251 Implemented
WM0120 # 08 Y:2018 08 2018 INSTALL OCCUPANCY SENSORS $1,092 $1,439 Not Implemented
WM0120 # 09 Y:2018 09 2018 USE PHOTOCELL CONTROLS $793 $1,120 Not Implemented
WM0120 # 10 Y:2018 10 2018 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $660 $405 Not Implemented
WM0120 # 11 Y:2018 11 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $408 $0 Not Implemented
WM0120 # 12 Y:2018 12 2018 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $258 $0 Not Implemented
WM0120 # 13 Y:2018 13 2018 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $135 $328 Not Implemented
MZ0245 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,959 $47,658 Implemented
MZ0245 # 02 Y:2017 02 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,450 $2,183 Implemented
MZ0245 # 03 Y:2017 03 2017 OPTIMIZE PLANT POWER FACTOR $13,572 $12,250 Not Implemented
MZ0245 # 04 Y:2017 04 2017 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $7,371 $0 Not Implemented