IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

736

matching recommendations
Reset
NAICS 3353 Electrical Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0227 # 07 Y:2019 07 2019 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $399 $750 Not Implemented
GT0926 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,597 $57,656 Implemented
GT0926 # 02 Y:2019 02 2019 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $27,641 $60,000 Not Implemented
GT0926 # 03 Y:2019 03 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $22,517 $565,692 Not Implemented
GT0926 # 04 Y:2019 04 2019 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $131,732 $1,140,000 Not Implemented
AM0779 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,460 $16,000 Implemented
AM0779 # 02 Y:2019 02 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,000 $8,765 Not Implemented
AM0779 # 03 Y:2019 03 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,160 $0 Not Implemented
AM0779 # 04 Y:2019 04 2019 USE SYNTHETIC LUBRICANT $3,033 $0 Not Implemented
AM0779 # 05 Y:2019 05 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,795 $1,000 Implemented
AM0779 # 06 Y:2019 06 2019 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,880 $6,600 Not Implemented
AM0779 # 07 Y:2019 07 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,380 $3,300 Implemented
AM0779 # 08 Y:2019 08 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $110 $240 Not Implemented
TR0009 # 01 Y:2018 01 2018 OPTIMIZE PLANT POWER FACTOR $3,043 $12,500 Not Implemented
TR0009 # 02 Y:2018 02 2018 RECYCLE FLUORESCENT LAMPS $6,608 $13,260 Implemented
TR0009 # 03 Y:2018 03 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $814 $0 Not Implemented
TR0009 # 04 Y:2018 04 2018 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $2,987 $15,373 Implemented
TR0009 # 05 Y:2018 05 2018 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $17,718 $3,748 Not Implemented
TR0009 # 06 Y:2018 06 2018 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $1,315 $14,000 Implemented
WM0120 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $37,818 $35,678 Implemented
WM0120 # 02 Y:2018 02 2018 USE RADIANT HEATER FOR SPOT HEATING $18,564 $28,796 Not Implemented
WM0120 # 03 Y:2018 03 2018 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $13,520 $0 Not Implemented
WM0120 # 04 Y:2018 04 2018 USE SOLAR HEAT TO MAKE ELECTRICTY $13,376 $48,514 Not Implemented
WM0120 # 05 Y:2018 05 2018 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $13,335 $22,000 Not Implemented
WM0120 # 06 Y:2018 06 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,903 $5,577 Not Implemented