Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
736
matching recommendationsNAICS | 33531 | Electrical Equipment Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0227 # 07 Y:2019 | 07 | 2019 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $399 | $750 | Not Implemented |
GT0926 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $31,597 | $57,656 | Implemented |
GT0926 # 02 Y:2019 | 02 | 2019 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $27,641 | $60,000 | Not Implemented |
GT0926 # 03 Y:2019 | 03 | 2019 | USE SOLAR HEAT TO MAKE ELECTRICTY | $22,517 | $565,692 | Not Implemented |
GT0926 # 04 Y:2019 | 04 | 2019 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $131,732 | $1,140,000 | Not Implemented |
AM0779 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,460 | $16,000 | Implemented |
AM0779 # 02 Y:2019 | 02 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,000 | $8,765 | Not Implemented |
AM0779 # 03 Y:2019 | 03 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,160 | $0 | Not Implemented |
AM0779 # 04 Y:2019 | 04 | 2019 | USE SYNTHETIC LUBRICANT | $3,033 | $0 | Not Implemented |
AM0779 # 05 Y:2019 | 05 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,795 | $1,000 | Implemented |
AM0779 # 06 Y:2019 | 06 | 2019 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $1,880 | $6,600 | Not Implemented |
AM0779 # 07 Y:2019 | 07 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,380 | $3,300 | Implemented |
AM0779 # 08 Y:2019 | 08 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $110 | $240 | Not Implemented |
TR0009 # 01 Y:2018 | 01 | 2018 | OPTIMIZE PLANT POWER FACTOR | $3,043 | $12,500 | Not Implemented |
TR0009 # 02 Y:2018 | 02 | 2018 | RECYCLE FLUORESCENT LAMPS | $6,608 | $13,260 | Implemented |
TR0009 # 03 Y:2018 | 03 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $814 | $0 | Not Implemented |
TR0009 # 04 Y:2018 | 04 | 2018 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $2,987 | $15,373 | Implemented |
TR0009 # 05 Y:2018 | 05 | 2018 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $17,718 | $3,748 | Not Implemented |
TR0009 # 06 Y:2018 | 06 | 2018 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $1,315 | $14,000 | Implemented |
WM0120 # 01 Y:2018 | 01 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $37,818 | $35,678 | Implemented |
WM0120 # 02 Y:2018 | 02 | 2018 | USE RADIANT HEATER FOR SPOT HEATING | $18,564 | $28,796 | Not Implemented |
WM0120 # 03 Y:2018 | 03 | 2018 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $13,520 | $0 | Not Implemented |
WM0120 # 04 Y:2018 | 04 | 2018 | USE SOLAR HEAT TO MAKE ELECTRICTY | $13,376 | $48,514 | Not Implemented |
WM0120 # 05 Y:2018 | 05 | 2018 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $13,335 | $22,000 | Not Implemented |
WM0120 # 06 Y:2018 | 06 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,903 | $5,577 | Not Implemented |