IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

89

matching recommendations
Reset
NAICS 33531 Electrical Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0260 # 04 Y:2022 04 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $4,800 $0 Not Implemented
IC0260 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,349 $400 Not Implemented
IC0260 # 02 Y:2022 02 2022 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $3,139 $0 Not Implemented
IC0260 # 01 Y:2022 01 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,208 $1,715 Not Implemented
IC0260 # 05 Y:2022 05 2022 INSTALL OCCUPANCY SENSORS $563 $1,190 Not Implemented
IC0260 # 03 Y:2022 03 2022 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,387 $3,452 Not Implemented
IC0246 # 04 Y:2021 04 2021 ELIMINATE LEAKS IN WATER LINES AND VALVES $3,527 $1,200 Not Implemented
IC0246 # 03 Y:2021 03 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $20,948 $40,000 Not Implemented
IC0246 # 02 Y:2021 02 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $433 $214 Not Implemented
IC0246 # 01 Y:2021 01 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,458 $4,300 Not Implemented
IC0246 # 05 Y:2021 05 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,840 $544 Not Implemented
BD0488 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $581 $425 n/a
BD0488 # 04 Y:2016 04 2016 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,615 $1,500 n/a
BD0488 # 03 Y:2016 03 2016 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,115 $3,770 n/a
BD0488 # 02 Y:2016 02 2016 INSTALL OCCUPANCY SENSORS $4,187 $600 n/a
BD0488 # 06 Y:2016 06 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $236 $800 n/a
BD0488 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,086 $45,630 n/a
BD0483 # 01 Y:2016 01 2016 INSULATE BARE EQUIPMENT $7,762 $1,810 Not Implemented
BD0483 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,361 $9,836 Not Implemented
BD0483 # 07 Y:2016 07 2016 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,172 $576 Not Implemented
BD0483 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,053 $10,965 Not Implemented
BD0483 # 04 Y:2016 04 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,476 $15 Not Implemented
BD0483 # 08 Y:2016 08 2016 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,074 $50 Not Implemented
BD0483 # 02 Y:2016 02 2016 USE RADIANT HEATER FOR SPOT HEATING $4,162 $8,800 Not Implemented
BD0483 # 06 Y:2016 06 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,961 $1,500 Not Implemented