IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

189

matching recommendations
Reset
NAICS 335311 Power, Distribution, and Specialty Transformer Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0558 # 06 Y:2024 06 2024 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $7,995 $37,000 Implemented
LE0558 # 04 Y:2024 04 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $896 $2,000 Not Implemented
LE0558 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,762 $1,400 Implemented
LE0558 # 02 Y:2024 02 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,863 $5,799 Implemented
LE0558 # 03 Y:2024 03 2024 INSTALL TIMERS AND/OR THERMOSTATS $1,010 $1,600 Implemented
LE0558 # 07 Y:2024 07 2024 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $474 $2,500 Implemented
LE0558 # 05 Y:2024 05 2024 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,840 $18,014 Implemented
WM0206 # 03 Y:2024 03 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $297 $125 Not Implemented
WM0206 # 04 Y:2024 04 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $261 $0 Not Implemented
WM0206 # 01 Y:2024 01 2024 USE RADIANT HEATER FOR SPOT HEATING $1,637 $6,780 Not Implemented
WM0206 # 02 Y:2024 02 2024 INSTALL OCCUPANCY SENSORS $1,568 $787 Not Implemented
TT0302 # 03 Y:2023 03 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $44,359 $90,000 Not Implemented
TT0302 # 01 Y:2023 01 2023 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $141,741 $909,720 Implemented
TT0302 # 02 Y:2023 02 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $61,184 $15,000 Not Implemented
TT0302 # 07 Y:2023 07 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,990 $20,000 Not Implemented
TT0302 # 08 Y:2023 08 2023 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $2,956 $965 Not Implemented
TT0302 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,127 $1,500 Implemented
TT0302 # 05 Y:2023 05 2023 METER WASTE WATER $18,930 $1,100 Implemented
TT0302 # 06 Y:2023 06 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,886 $0 Not Implemented
WV0637 # 06 Y:2023 06 2023 DEVELOP A REPAIR/REPLACE POLICY $502 $617 Implemented
WV0637 # 08 Y:2023 08 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $122 $600 Implemented
WV0637 # 05 Y:2023 05 2023 UPGRADE CONTROLS ON COMPRESSORS $572 $1,465 Not Implemented
WV0637 # 04 Y:2023 04 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $678 $50 Implemented
WV0637 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,065 $3,353 Implemented
WV0637 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,462 $188 Implemented