IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

223

matching recommendations
Reset
NAICS 335312 Motor and Generator Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0865 # 05 Y:2013 05 2013 INSTALL OCCUPANCY SENSORS $138 $1,771 Not Implemented
OK0865 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,091 $35,380 Not Implemented
OK0865 # 07 Y:2013 07 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,472 $1,050 Implemented
OK0865 # 08 Y:2013 08 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,177 $462 Implemented
OK0865 # 09 Y:2013 09 2013 RECOVER WASTE HEAT FROM EQUIPMENT $7,362 $1,220 Not Implemented
OK0865 # 10 Y:2013 10 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,044 $3,080 Not Implemented
OK0865 # 11 Y:2013 11 2013 OPTIMIZE PLANT POWER FACTOR $4,129 $11,222 Not Implemented
MAS034 # 01 Y:2012 01 2012 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $19,479 $19,600 Not Implemented
MAS034 # 02 Y:2012 02 2012 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $7,681 $23,000 Not Implemented
MAS034 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,178 $7,500 Implemented
MAS034 # 04 Y:2012 04 2012 INSTALL OCCUPANCY SENSORS $760 $1,600 Not Implemented
CO0649 # 01 Y:2011 01 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $12,260 $3,200 Not Implemented
CO0649 # 02 Y:2011 02 2011 USE DEMAND CONTROLLER OR LOAD SHEDDER $9,530 $20,000 Not Implemented
CO0649 # 03 Y:2011 03 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $2,610 $480 Not Implemented
CO0649 # 04 Y:2011 04 2011 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $1,270 $3,910 Not Implemented
CO0649 # 05 Y:2011 05 2011 INSTALL SKYLIGHTS $38,050 $70,550 Not Implemented
CO0649 # 06 Y:2011 06 2011 REDUCE VENTILATION AIR $3,200 $60 Not Implemented
CO0649 # 07 Y:2011 07 2011 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $2,770 $60 Not Implemented
CO0649 # 08 Y:2011 08 2011 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $1,150 $60 Not Implemented
AM0571 # 01 Y:2010 01 2010 OPTIMIZE PLANT POWER FACTOR $34,630 $98,400 Not Implemented
AM0571 # 02 Y:2010 02 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $33,740 $2,160 Not Implemented
AM0571 # 03 Y:2010 03 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $24,200 $300 Implemented
AM0571 # 04 Y:2010 04 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $10,010 $31,300 Implemented
AM0571 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,400 $1,500 Implemented
AM0571 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,700 $1,900 Implemented