IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

36

matching recommendations
Reset
NAICS 335313 Switchgear and Switchboard Apparatus Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0260 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,349 $400 Not Implemented
IC0260 # 05 Y:2022 05 2022 INSTALL OCCUPANCY SENSORS $563 $1,190 Not Implemented
IC0260 # 04 Y:2022 04 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $4,800 $0 Not Implemented
IC0260 # 03 Y:2022 03 2022 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,387 $3,452 Not Implemented
IC0260 # 02 Y:2022 02 2022 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $3,139 $0 Not Implemented
IC0260 # 01 Y:2022 01 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,208 $1,715 Not Implemented
BD0488 # 03 Y:2016 03 2016 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,115 $3,770 n/a
BD0488 # 06 Y:2016 06 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $236 $800 n/a
BD0488 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $581 $425 n/a
BD0488 # 04 Y:2016 04 2016 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,615 $1,500 n/a
BD0488 # 02 Y:2016 02 2016 INSTALL OCCUPANCY SENSORS $4,187 $600 n/a
BD0488 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,086 $45,630 n/a
IC0119 # 08 Y:2006 08 2006 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $30,353 $312,000 Not Implemented
IC0119 # 07 Y:2006 07 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,048 $38,744 Implemented
IC0119 # 06 Y:2006 06 2006 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $130,000 $0 Not Implemented
IC0119 # 01 Y:2006 01 2006 RECOVER AND REUSE SPENT ACID BATHS $32,160 $82,800 Not Implemented
IC0119 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,829 $600 Implemented
IC0119 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $34,559 $114,725 Implemented
IC0119 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,402 $61,775 Implemented
IC0119 # 05 Y:2006 05 2006 RECOVER WASTE HEAT FROM EQUIPMENT $33,836 $144,000 Not Implemented
BD0225 # 02 Y:2003 02 2003 INSTALL OCCUPANCY SENSORS $1,196 $2,100 Not Implemented
BD0225 # 13 Y:2003 13 2003 CONTRACT A WOOD PALLET RECYCLING COMPANY $400 $120 Not Implemented
BD0225 # 03 Y:2003 03 2003 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,618 $5,072 Not Implemented
BD0225 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $724 $3,630 Not Implemented
BD0225 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $873 $300 Not Implemented