IAC logo
IAC Assessment: BD0225
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0225
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2003
Principal Product Enclosures for Generators and Generator Controls
NAICS 335313 - Switchgear and Switchboard Apparatus Manufacturing
SIC 3448 - Prefabricated Metal Buildings
Sales $1,000,000-$5,000,000
# of Employees 40
Plant Area (Sq.Ft.) 70,000
Annual Production 100 Pieces
Production Hrs. Annual 2,340
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $18,319 268,722 kWh $0.07
Electricity Demand $3,770 1,578 kW-months/year $2.39
Electricity Fees $2,340 - $ -
Natural Gas $9,266 1,590 MMBtu $5.83
Fuel Oil #2 $9,000 1,380 MMBtu $6.52
TOTAL ENERGY COSTS $42,695
RECOMMENDED SAVINGS* $27,759 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Fuel Oil #2 Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Fuel Oil #2 Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ $ $ $ $ $ $ $
01: 2.3192 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS Savings:
$3,792
Cost:
$10,000
$18,319 268,722 $3,773 1,578 $(-15,613) (-2,394) - - - - $(-2,687) - - - - - - - $18,319
268,722
kWh
$3,773
1,578
kW-months/year
$(-15,613)
(-2,394)
MMBtu
-
-
gal
-
-
lb
$(-2,687)
-
$
-
-
$
-
-
$
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,196
Cost:
$2,100
$962 14,110 $234 98 - - - - - - - - - - - - - - $962
14,110
kWh
$234
98
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$1,618
Cost:
$5,072
$3,982 51,252 $487 204 - - $(-2,851) (-3,168) - - - - - - - - - - $3,982
51,252
kWh
$487
204
kW-months/year
-
-
MMBtu
$(-2,851)
(-3,168)
gal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$724
Cost:
$3,630
$701 10,284 $126 53 - - - - - - $(-34) - - - $(-69) - - - $701
10,284
kWh
$126
53
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
$(-34)
-
$
-
-
$
$(-69)
-
$
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$873
Cost:
$300
$740 10,834 $133 56 - - - - - - - - - - - - - - $740
10,834
kWh
$133
56
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$439
Cost:
$2,280
$465 6,809 $15 6 - - - - - - $(-41) - - - - - - - $465
6,809
kWh
$15
6
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
$(-41)
-
$
-
-
$
-
-
$
-
-
$
07: 2.7122 DISCONNECT BALLASTS Savings:
$442
Cost:
$60
$358 5,242 $64 27 - - - - - - $9 - - - $11 - - - $358
5,242
kWh
$64
27
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
$9
-
$
-
-
$
$11
-
$
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$338
Cost:
$270
$204 2,996 $10 4 - - - - - - $52 - - - $72 - - - $204
2,996
kWh
$10
4
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
$52
-
$
-
-
$
$72
-
$
-
-
$
09: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$240
Cost:
$350
$210 3,075 $30 12 - - - - - - - - - - - - - - $210
3,075
kWh
$30
12
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
10: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$224
Cost:
$1,000
$197 2,886 $27 11 - - - - - - - - - - - - - - $197
2,886
kWh
$27
11
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
11: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS Savings:
$7,920
Cost:
$2,200
- - - - - - $7,920 288 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$7,920
288
gal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
12: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE Savings:
$3,180
Cost:
$500
- - - - - - - - $3,180 120,000 - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$3,180
120,000
lb
-
-
$
-
-
$
-
-
$
-
-
$
13: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$400
Cost:
$120
- - - - - - - - $400 200 - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$400
200
lb
-
-
$
-
-
$
-
-
$
-
-
$
14: 2.3137 USE POWER DURING OFF-PEAK PERIODS Savings:
$3,393
Cost:
$4,000
- - - - - - - - - - - - $3,393 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
$3,393
-
$
-
-
$
-
-
$
15: 4.4470 AUTOMATE PAYROLL SYSTEM Savings:
$2,080
Cost:
$2,500
- - - - - - - - - - - - - - - - $2,080 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
$2,080
-
$
16: 4.6520 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$900
Cost:
$300
- - - - - - - - - - - - - - - - $900 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
$900
-
$
TOTAL RECOMMENDED Savings:
$27,759
Cost:
$34,682
$26,138 376,210 $4,899 2,049 $(-15,613) (-2,394) $5,069 (-2,880) $3,580 120,200 $(-2,701) - $3,393 - $14 - $2,980 - $26,138
376,210
kWh
$4,899
2,049
kW-months/year
$(-15,613)
(-2,394)
MMBtu
$5,069
(-2,880)
gal
$3,580
120,200
lb
$(-2,701)
-
$
$3,393
-
$
$14
-
$
$2,980
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ $ $ $ $ $ $ $
Electricity Usage Electricity Demand Fuel Oil #2 Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Fuel Oil #2 Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost One-time Revenue or Avoided Cost