Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Bradley University |
---|---|
Assessment Year | 2003 |
Principal Product | Enclosures for Generators and Generator Controls |
NAICS | 335313 - Switchgear and Switchboard Apparatus Manufacturing |
SIC | 3448 - Prefabricated Metal Buildings |
Sales | $1,000,000-$5,000,000 |
# of Employees | 40 |
Plant Area (Sq.Ft.) | 70,000 |
Annual Production | 100 Pieces |
Production Hrs. Annual | 2,340 |
Location (State) | IL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $18,319 | 268,722 | kWh | $0.07 |
Electricity Demand | $3,770 | 1,578 | kW-months/year | $2.39 |
Electricity Fees | $2,340 | - | $ | - |
Natural Gas | $9,266 | 1,590 | MMBtu | $5.83 |
Fuel Oil #2 | $9,000 | 1,380 | MMBtu | $6.52 |
TOTAL ENERGY COSTS | $42,695 | |||
RECOMMENDED SAVINGS* | $27,759 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Fuel Oil #2 | Other Liquid (haz) | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Ancillary Material Cost | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Fuel Oil #2 | Other Liquid (haz) | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Ancillary Material Cost | One-time Revenue or Avoided Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | lb | $ | $ | $ | $ | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3192 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS |
Savings: $3,792 Cost: $10,000 |
$18,319 | 268,722 | $3,773 | 1,578 | $(-15,613) | (-2,394) | - | - | - | - | $(-2,687) | - | - | - | - | - | - | - |
$18,319 268,722 kWh |
$3,773 1,578 kW-months/year |
$(-15,613) (-2,394) MMBtu |
- - gal |
- - lb |
$(-2,687) - $ |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $1,196 Cost: $2,100 |
$962 | 14,110 | $234 | 98 | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
$962 14,110 kWh |
$234 98 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $1,618 Cost: $5,072 |
$3,982 | 51,252 | $487 | 204 | - | - | $(-2,851) | (-3,168) | - | - | - | - | - | - | - | - | - | - |
$3,982 51,252 kWh |
$487 204 kW-months/year |
- - MMBtu |
$(-2,851) (-3,168) gal |
- - lb |
- - $ |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $724 Cost: $3,630 |
$701 | 10,284 | $126 | 53 | - | - | - | - | - | - | $(-34) | - | - | - | $(-69) | - | - | - |
$701 10,284 kWh |
$126 53 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
$(-34) - $ |
- - $ |
$(-69) - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $873 Cost: $300 |
$740 | 10,834 | $133 | 56 | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
$740 10,834 kWh |
$133 56 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $439 Cost: $2,280 |
$465 | 6,809 | $15 | 6 | - | - | - | - | - | - | $(-41) | - | - | - | - | - | - | - |
$465 6,809 kWh |
$15 6 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
$(-41) - $ |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7122 DISCONNECT BALLASTS |
Savings: $442 Cost: $60 |
$358 | 5,242 | $64 | 27 | - | - | - | - | - | - | $9 | - | - | - | $11 | - | - | - |
$358 5,242 kWh |
$64 27 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
$9 - $ |
- - $ |
$11 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $338 Cost: $270 |
$204 | 2,996 | $10 | 4 | - | - | - | - | - | - | $52 | - | - | - | $72 | - | - | - |
$204 2,996 kWh |
$10 4 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
$52 - $ |
- - $ |
$72 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4314 USE SYNTHETIC LUBRICANT |
Savings: $240 Cost: $350 |
$210 | 3,075 | $30 | 12 | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
$210 3,075 kWh |
$30 12 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $224 Cost: $1,000 |
$197 | 2,886 | $27 | 11 | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
$197 2,886 kWh |
$27 11 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS |
Savings: $7,920 Cost: $2,200 |
- | - | - | - | - | - | $7,920 | 288 | - | - | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$7,920 288 gal |
- - lb |
- - $ |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE |
Savings: $3,180 Cost: $500 |
- | - | - | - | - | - | - | - | $3,180 | 120,000 | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
$3,180 120,000 lb |
- - $ |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY |
Savings: $400 Cost: $120 |
- | - | - | - | - | - | - | - | $400 | 200 | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
$400 200 lb |
- - $ |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
14: 2.3137 USE POWER DURING OFF-PEAK PERIODS |
Savings: $3,393 Cost: $4,000 |
- | - | - | - | - | - | - | - | - | - | - | - | $3,393 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
$3,393 - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
15: 4.447 AUTOMATE PAYROLL SYSTEM |
Savings: $2,080 Cost: $2,500 |
- | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | $2,080 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - $ |
- - $ |
$2,080 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
16: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES |
Savings: $900 Cost: $300 |
- | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | $900 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - $ |
- - $ |
$900 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $27,759 Cost: $34,682 |
$26,138 | 376,210 | $4,899 | 2,049 | $(-15,613) | (-2,394) | $5,069 | (-2,880) | $3,580 | 120,200 | $(-2,701) | - | $3,393 | - | $14 | - | $2,980 | - | $26,138 376,210 kWh |
$4,899 2,049 kW-months/year |
$(-15,613) (-2,394) MMBtu |
$5,069 (-2,880) gal |
$3,580 120,200 lb |
$(-2,701) - $ |
$3,393 - $ |
$14 - $ |
$2,980 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | lb | $ | $ | $ | $ | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Fuel Oil #2 | Other Liquid (haz) | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Ancillary Material Cost | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Fuel Oil #2 | Other Liquid (haz) | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Ancillary Material Cost | One-time Revenue or Avoided Cost |