IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

404

matching recommendations
Reset
NAICS 3359 Other Electrical Equipment and Component Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0720 # 07 Y:2013 07 2013 REDUCE VENTILATION AIR $4,116 $2,500 Implemented
NC0488 # 02 Y:2013 02 2013 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $6,453 $300 Implemented
NC0488 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $627 $100 Implemented
NC0488 # 06 Y:2013 06 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $323 $600 Implemented
NC0488 # 07 Y:2013 07 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,980 $19,622 Implemented
OR0604 # 01 Y:2013 01 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,634 $500 Implemented
OR0604 # 05 Y:2013 05 2013 UPGRADE CONTROLS ON COMPRESSORS $11,228 $11,850 Implemented
MA0705 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,284 $19,400 Implemented
MA0705 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,053 $2,800 Implemented
MA0705 # 05 Y:2013 05 2013 OPTIMIZE PLANT POWER FACTOR $3,939 $13,700 Implemented
MA0705 # 07 Y:2013 07 2013 PAY UTILITY BILLS ON TIME $1,191 $500 Implemented
IP0014 # 02 Y:2013 02 2013 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,997 $0 Implemented
IP0014 # 03 Y:2013 03 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,183 $0 Implemented
IP0014 # 04 Y:2013 04 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,360 $0 Implemented
IP0014 # 05 Y:2013 05 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $263 $0 Implemented
IP0012 # 01 Y:2013 01 2013 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $21,525 $0 Implemented
IP0012 # 02 Y:2013 02 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $5,948 $0 Implemented
IP0012 # 03 Y:2013 03 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,627 $0 Implemented
IP0012 # 04 Y:2013 04 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,371 $0 Implemented
IP0012 # 05 Y:2013 05 2013 RECOVER WASTE HEAT FROM EQUIPMENT $1,316 $1,171 Implemented
SF0426 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,979 $17,191 Implemented
UA3025 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $38,774 $8,081 Implemented
MZ0106 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,548 $31,400 Implemented
MZ0106 # 03 Y:2012 03 2012 INSTALL OCCUPANCY SENSORS $5,174 $1,750 Implemented
MZ0106 # 05 Y:2012 05 2012 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $20,969 $3,000 Implemented