Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,027
matching recommendationsNAICS | 3359 | Other Electrical Equipment and Component Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0564 # 07 Y:2024 | 07 | 2024 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $1,314 | $4,000 | n/a |
LE0564 # 05 Y:2024 | 05 | 2024 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $10,054 | $5,500 | n/a |
LE0564 # 11 Y:2024 | 11 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,320 | $61,333 | n/a |
LE0564 # 06 Y:2024 | 06 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $357 | $1,080 | n/a |
LE0564 # 09 Y:2024 | 09 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,861 | $13,312 | n/a |
LE0564 # 08 Y:2024 | 08 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,023 | $4,500 | n/a |
LE0564 # 03 Y:2024 | 03 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $5,156 | $200 | n/a |
LE0564 # 02 Y:2024 | 02 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,789 | $100 | n/a |
LE0564 # 01 Y:2024 | 01 | 2024 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,016 | $0 | n/a |
LE0564 # 10 Y:2024 | 10 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $697 | $3,400 | n/a |
UU0242 # 10 Y:2024 | 10 | 2024 | UPGRADE OBSOLETE EQUIPMENT | $12,250 | $84,300 | n/a |
UU0242 # 08 Y:2024 | 08 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,658 | $13,800 | n/a |
UU0242 # 06 Y:2024 | 06 | 2024 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $21,730 | $82,100 | n/a |
UU0242 # 04 Y:2024 | 04 | 2024 | INSTALL OCCUPANCY SENSORS | $5,187 | $5,143 | n/a |
UU0242 # 07 Y:2024 | 07 | 2024 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $6,520 | $9,510 | n/a |
UU0242 # 03 Y:2024 | 03 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,164 | $37,300 | n/a |
UU0242 # 02 Y:2024 | 02 | 2024 | CLOSE OFF UNNEEDED STEAM LINES | $10,220 | $4,400 | n/a |
UU0242 # 09 Y:2024 | 09 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $12,487 | $68,600 | n/a |
UU0242 # 05 Y:2024 | 05 | 2024 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $8,004 | $11,422 | n/a |
UU0242 # 01 Y:2024 | 01 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $139,774 | $4,000 | n/a |
CW0130 # 03 Y:2024 | 03 | 2024 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $17,298 | $8,391 | n/a |
CW0130 # 05 Y:2024 | 05 | 2024 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $7,210 | $13,000 | n/a |
CW0130 # 01 Y:2024 | 01 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,562 | $17,397 | n/a |
CW0130 # 02 Y:2024 | 02 | 2024 | INSTALL OCCUPANCY SENSORS | $4,196 | $2,050 | n/a |
CW0130 # 04 Y:2024 | 04 | 2024 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $202 | $424 | n/a |