IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,067

matching recommendations
Reset
NAICS 3359 Other Electrical Equipment and Component Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0179 # 03 Y:2023 03 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $19,788 $345 Not Implemented
IP0179 # 04 Y:2023 04 2023 INSTALL OCCUPANCY SENSORS $814 $9 Not Implemented
IP0179 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,534 $182 Not Implemented
IP0179 # 06 Y:2023 06 2023 USE HEAT PUMP FOR SPACE CONDITIONING $26,133 $46,106 Not Implemented
IP0179 # 07 Y:2023 07 2023 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $378 $3,830 Not Implemented
NT0019 # 05 Y:2024 05 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,487 $4,553 Not Implemented
NT0019 # 04 Y:2024 04 2024 APPLY FOR INVESTMENT INCENTIVES $12,574 $0 Not Implemented
NT0019 # 03 Y:2024 03 2024 OPTIMIZE PLANT POWER FACTOR $36,036 $9,814 Not Implemented
NT0019 # 02 Y:2024 02 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,486 $33,471 Not Implemented
NT0019 # 01 Y:2024 01 2024 INSULATE BARE EQUIPMENT $60,556 $294,320 Not Implemented
SU0532 # 01 Y:2023 01 2023 DISCONNECT BALLASTS $6,186 $0 Not Implemented
SU0532 # 02 Y:2023 02 2023 PAY BILLS ON TIME TO AVOID LATE FEES $1,177 $0 Implemented
SU0532 # 03 Y:2023 03 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,864 $0 Not Implemented
SU0532 # 04 Y:2023 04 2023 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $6,803 $0 Implemented
SU0532 # 05 Y:2023 05 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,119 $2,000 Implemented
SU0532 # 06 Y:2023 06 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,953 $8,568 Implemented
SU0532 # 07 Y:2023 07 2023 INSTALL OCCUPANCY SENSORS $827 $580 Implemented
SU0532 # 08 Y:2023 08 2023 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,165 $0 Not Implemented
SU0532 # 09 Y:2023 09 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $24 $100 Implemented
SU0532 # 10 Y:2023 10 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $728 $0 Not Implemented
NT0013 # 07 Y:2023 07 2023 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $720,000 $120,000 Implemented
NT0013 # 06 Y:2023 06 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,102 $0 Implemented
NT0013 # 05 Y:2023 05 2023 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $17,430 $54,000 Implemented
NT0013 # 04 Y:2023 04 2023 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $49,000 $83,421 Implemented
NT0013 # 03 Y:2023 03 2023 OPTIMIZE PLANT POWER FACTOR $10,076 $5,043 Not Implemented