IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,027

matching recommendations
Reset
NAICS 3359 Other Electrical Equipment and Component Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0209 # 01 Y:2022 01 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $18,464 $0 Not Implemented
DL0209 # 02 Y:2022 02 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,805 $0 Not Implemented
DL0209 # 03 Y:2022 03 2022 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $3,907 $0 Not Implemented
DL0209 # 04 Y:2022 04 2022 REDUCE VENTILATION AIR $887 $0 Not Implemented
DL0209 # 05 Y:2022 05 2022 REDUCE VENTILATION AIR $179 $37 Not Implemented
DL0209 # 06 Y:2022 06 2022 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $5,739 $0 Not Implemented
DL0209 # 07 Y:2022 07 2022 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,131 $0 Not Implemented
DL0209 # 08 Y:2022 08 2022 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,848 $0 Not Implemented
DL0209 # 09 Y:2022 09 2022 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,426 $0 Not Implemented
DL0209 # 10 Y:2022 10 2022 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $4,478 $3,000 Not Implemented
DL0209 # 11 Y:2022 11 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,731 $6,000 Not Implemented
DL0209 # 12 Y:2022 12 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,254 $1,587 Not Implemented
DL0209 # 13 Y:2022 13 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $658 $10,000 Not Implemented
MU0007 # 01 Y:2022 01 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,417 $10,160 Implemented
MU0007 # 02 Y:2022 02 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,200 $7,825 Not Implemented
MU0007 # 03 Y:2022 03 2022 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,914 $0 Implemented
MU0007 # 04 Y:2022 04 2022 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $1,004 $0 Implemented
MU0007 # 05 Y:2022 05 2022 INSTALL SET-BACK TIMERS $612 $541 Not Implemented
MU0007 # 06 Y:2022 06 2022 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $12 $44 Implemented
UF0575 # 01 Y:2022 01 2022 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $320,724 $1,068,750 Implemented
UF0575 # 02 Y:2022 02 2022 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $175,432 $0 Not Implemented
UF0575 # 03 Y:2022 03 2022 USE DEMAND CONTROLLER OR LOAD SHEDDER $59,112 $64,054 Implemented
UF0575 # 04 Y:2022 04 2022 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $5,193 $12,000 Not Implemented
UF0575 # 05 Y:2022 05 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,361 $0 Implemented
UF0575 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,831 $290 Implemented