IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

47

matching recommendations
Reset
NAICS 3359 Other Electrical Equipment and Component Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0430 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,052 $100 Implemented
NC0430 # 01 Y:2011 01 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,839 $0 Implemented
MA0668 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,378 $1,800 Implemented
MA0668 # 07 Y:2011 07 2011 INSULATE BARE EQUIPMENT $986 $950 Implemented
MA0668 # 06 Y:2011 06 2011 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,802 $7,000 Not Implemented
MA0668 # 05 Y:2011 05 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,755 $200 Not Implemented
MA0668 # 04 Y:2011 04 2011 INSULATE BARE EQUIPMENT $3,004 $3,750 Implemented
MA0668 # 03 Y:2011 03 2011 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $3,401 $11,610 Implemented
MA0668 # 02 Y:2011 02 2011 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $7,899 $11,500 Implemented
SU0306 # 07 Y:2011 07 2011 OPTIMIZE PLANT POWER FACTOR $8,914 $55,516 Not Implemented
SU0306 # 02 Y:2011 02 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,375 $0 Implemented
SU0306 # 03 Y:2011 03 2011 RECOVER AND REUSE SPENT ACID BATHS $49,465 $4,029 Implemented
SU0306 # 04 Y:2011 04 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,901 $337 Implemented
SU0306 # 05 Y:2011 05 2011 RECOVER AND REUSE COOLING WATER $32,137 $12,052 Implemented
SU0306 # 06 Y:2011 06 2011 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $8,700 $35,000 Not Implemented
SU0306 # 01 Y:2011 01 2011 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $19,413 $0 Implemented
GT0879 # 06 Y:2011 06 2011 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $339,042 $1,340,000 Not Implemented
GT0879 # 05 Y:2011 05 2011 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $4,339 $8,740 Not Implemented
GT0879 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $45,254 $2,500 Implemented
GT0879 # 03 Y:2011 03 2011 INSTALL OCCUPANCY SENSORS $3,260 $4,050 Not Implemented
GT0879 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,458 $56,350 Not Implemented
GT0879 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,235 $1 Not Implemented