Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
183
matching recommendationsNAICS | 335911 | Storage Battery Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0988 # 01 Y:2025 | 01 | 2025 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $14,344 | $800 | n/a |
GT0988 # 02 Y:2025 | 02 | 2025 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $5,947 | $400 | n/a |
GT0988 # 04 Y:2025 | 04 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $598 | $200 | n/a |
GT0988 # 05 Y:2025 | 05 | 2025 | OPTIMIZE PLANT POWER FACTOR | $10,998 | $47,093 | n/a |
GT0988 # 06 Y:2025 | 06 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $91,923 | $962,674 | n/a |
GT0988 # 03 Y:2025 | 03 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $18,172 | $1,850 | n/a |
CI0035 # 05 Y:2024 | 05 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $27,879 | $16,500 | n/a |
CI0035 # 04 Y:2024 | 04 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $41,839 | $6,000 | n/a |
CI0035 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $51,626 | $1,800 | n/a |
CI0035 # 02 Y:2024 | 02 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $86,595 | $200,000 | n/a |
CI0035 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $155,337 | $1,217,286 | n/a |
CI0035 # 06 Y:2024 | 06 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,387 | $20,213 | n/a |
CI0035 # 07 Y:2024 | 07 | 2024 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $9,944 | $9,750 | n/a |
CI0035 # 08 Y:2024 | 08 | 2024 | INSTALL OCCUPANCY SENSORS | $4,779 | $4,500 | n/a |
CI0035 # 10 Y:2024 | 10 | 2024 | USE PHOTOCELL CONTROLS | $3,673 | $1,013 | n/a |
CI0035 # 09 Y:2024 | 09 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,345 | $2,340 | n/a |
GT0978 # 01 Y:2024 | 01 | 2024 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $14,430 | $400 | n/a |
GT0978 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $46,530 | $1,850 | n/a |
GT0978 # 05 Y:2024 | 05 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $23,328 | $36,015 | n/a |
GT0978 # 06 Y:2024 | 06 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $310,364 | $5,706,740 | n/a |
GT0978 # 03 Y:2024 | 03 | 2024 | INSTALL OCCUPANCY SENSORS | $647 | $390 | n/a |
GT0978 # 04 Y:2024 | 04 | 2024 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $292 | $270 | n/a |
MZ0331 # 03 Y:2022 | 03 | 2022 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $91,773 | $9,040 | Implemented |
MZ0331 # 02 Y:2022 | 02 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,037 | $46,350 | Implemented |
MZ0331 # 01 Y:2022 | 01 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23,162 | $25,757 | Implemented |