IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

183

matching recommendations
Reset
NAICS 335911 Storage Battery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0536 # 01 Y:2019 01 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $10,130 $557 Not Implemented
UF0536 # 02 Y:2019 02 2019 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $5,331 $25,000 Not Implemented
UF0536 # 03 Y:2019 03 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,433 $2,264 Not Implemented
UF0536 # 04 Y:2019 04 2019 CLEAN CONDENSER TUBES $4,554 $4,248 Not Implemented
UF0536 # 05 Y:2019 05 2019 INSTALL AN UNINTERUPTABLE POWER SUPPLY $25,860 $33,265 Not Implemented
UF0536 # 06 Y:2019 06 2019 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $18,000 $18,548 Not Implemented
UF0536 # 07 Y:2019 07 2019 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $11,297 $3,028 Not Implemented
GT0916 # 01 Y:2018 01 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $14,228 $263 Implemented
GT0916 # 02 Y:2018 02 2018 AIR CONDITION ONLY SPACE NECESSARY $5,518 $200 Not Implemented
GT0916 # 03 Y:2018 03 2018 USE OPTIMUM TEMPERATURE $29,211 $1,600 Not Implemented
GT0916 # 04 Y:2018 04 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $55,747 $3,800 Implemented
GT0916 # 05 Y:2018 05 2018 INSTALL OCCUPANCY SENSORS $41,023 $3,991 Not Implemented
GT0916 # 06 Y:2018 06 2018 INSULATE BARE EQUIPMENT $12,211 $1,242 Not Implemented
GT0916 # 07 Y:2018 07 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $42,215 $10,400 Implemented
GT0916 # 08 Y:2018 08 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $48,406 $38,834 Implemented
GT0916 # 09 Y:2018 09 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $49,820 $207,295 Not Implemented
OR0687 # 05 Y:2017 05 2017 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $6,460 $16,124 Not Implemented
OR0687 # 01 Y:2017 01 2017 ADJUST BURNERS FOR EFFICIENT OPERATION $2,090 $600 Not Implemented
OR0687 # 02 Y:2017 02 2017 USE PHOTOCELL CONTROLS $2,967 $2,000 Not Implemented
OR0687 # 03 Y:2017 03 2017 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $205,629 $340,000 Not Implemented
OR0687 # 04 Y:2017 04 2017 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $3,195 $5,650 Not Implemented
MZ0237 # 02 Y:2017 02 2017 INSTALL OCCUPANCY SENSORS $262 $800 Not Implemented
MZ0237 # 06 Y:2017 06 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,362 $25,000 Implemented
MZ0237 # 08 Y:2017 08 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $22,338 $0 Implemented
MZ0237 # 07 Y:2017 07 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $69 $0 Implemented