Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
183
matching recommendationsNAICS | 335911 | Storage Battery Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0536 # 01 Y:2019 | 01 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $10,130 | $557 | Not Implemented |
UF0536 # 02 Y:2019 | 02 | 2019 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $5,331 | $25,000 | Not Implemented |
UF0536 # 03 Y:2019 | 03 | 2019 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,433 | $2,264 | Not Implemented |
UF0536 # 04 Y:2019 | 04 | 2019 | CLEAN CONDENSER TUBES | $4,554 | $4,248 | Not Implemented |
UF0536 # 05 Y:2019 | 05 | 2019 | INSTALL AN UNINTERUPTABLE POWER SUPPLY | $25,860 | $33,265 | Not Implemented |
UF0536 # 06 Y:2019 | 06 | 2019 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $18,000 | $18,548 | Not Implemented |
UF0536 # 07 Y:2019 | 07 | 2019 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $11,297 | $3,028 | Not Implemented |
GT0916 # 01 Y:2018 | 01 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $14,228 | $263 | Implemented |
GT0916 # 02 Y:2018 | 02 | 2018 | AIR CONDITION ONLY SPACE NECESSARY | $5,518 | $200 | Not Implemented |
GT0916 # 03 Y:2018 | 03 | 2018 | USE OPTIMUM TEMPERATURE | $29,211 | $1,600 | Not Implemented |
GT0916 # 04 Y:2018 | 04 | 2018 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $55,747 | $3,800 | Implemented |
GT0916 # 05 Y:2018 | 05 | 2018 | INSTALL OCCUPANCY SENSORS | $41,023 | $3,991 | Not Implemented |
GT0916 # 06 Y:2018 | 06 | 2018 | INSULATE BARE EQUIPMENT | $12,211 | $1,242 | Not Implemented |
GT0916 # 07 Y:2018 | 07 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $42,215 | $10,400 | Implemented |
GT0916 # 08 Y:2018 | 08 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $48,406 | $38,834 | Implemented |
GT0916 # 09 Y:2018 | 09 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $49,820 | $207,295 | Not Implemented |
OR0687 # 05 Y:2017 | 05 | 2017 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $6,460 | $16,124 | Not Implemented |
OR0687 # 01 Y:2017 | 01 | 2017 | ADJUST BURNERS FOR EFFICIENT OPERATION | $2,090 | $600 | Not Implemented |
OR0687 # 02 Y:2017 | 02 | 2017 | USE PHOTOCELL CONTROLS | $2,967 | $2,000 | Not Implemented |
OR0687 # 03 Y:2017 | 03 | 2017 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $205,629 | $340,000 | Not Implemented |
OR0687 # 04 Y:2017 | 04 | 2017 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $3,195 | $5,650 | Not Implemented |
MZ0237 # 02 Y:2017 | 02 | 2017 | INSTALL OCCUPANCY SENSORS | $262 | $800 | Not Implemented |
MZ0237 # 06 Y:2017 | 06 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,362 | $25,000 | Implemented |
MZ0237 # 08 Y:2017 | 08 | 2017 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $22,338 | $0 | Implemented |
MZ0237 # 07 Y:2017 | 07 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $69 | $0 | Implemented |