IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

28

matching recommendations
Reset
NAICS 335912 Primary Battery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0476 # 01 Y:2019 01 2019 DISCONNECT BALLASTS $216 $0 Implemented
SU0476 # 02 Y:2019 02 2019 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,702 $131 Implemented
SU0476 # 04 Y:2019 04 2019 INSTALL OCCUPANCY SENSORS $803 $433 Implemented
IP0014 # 02 Y:2013 02 2013 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,997 $0 Implemented
IP0014 # 03 Y:2013 03 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,183 $0 Implemented
IP0014 # 04 Y:2013 04 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,360 $0 Implemented
IP0014 # 05 Y:2013 05 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $263 $0 Implemented
IP0012 # 02 Y:2013 02 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $5,948 $0 Implemented
IP0012 # 01 Y:2013 01 2013 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $21,525 $0 Implemented
IP0012 # 05 Y:2013 05 2013 RECOVER WASTE HEAT FROM EQUIPMENT $1,316 $1,171 Implemented
IP0012 # 04 Y:2013 04 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,371 $0 Implemented
IP0012 # 03 Y:2013 03 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,627 $0 Implemented
MZ0099 # 05 Y:2012 05 2012 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $3,108 $22,500 Implemented
MZ0099 # 04 Y:2012 04 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,358 $940 Implemented
MZ0099 # 03 Y:2012 03 2012 INSTALL OCCUPANCY SENSORS $2,144 $2,080 Implemented
MZ0099 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,582 $33,200 Implemented
MZ0099 # 01 Y:2012 01 2012 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $43,935 $92,930 Implemented
UA0015 # 04 Y:2008 04 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $204 $0 Implemented
UA0015 # 05 Y:2008 05 2008 INSTALL TIMERS AND/OR THERMOSTATS $7,573 $823 Implemented
MA0624 # 12 Y:2007 12 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,045 $5,670 Implemented
MA0624 # 10 Y:2007 10 2007 TURN OFF EQUIPMENT WHEN NOT IN USE $4,007 $12,000 Implemented
MA0624 # 08 Y:2007 08 2007 RECOVER WASTE HEAT FROM EQUIPMENT $4,655 $4,000 Implemented
MA0624 # 07 Y:2007 07 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,741 $0 Implemented
MA0624 # 06 Y:2007 06 2007 USE DEMAND CONTROLLER OR LOAD SHEDDER $11,448 $2,500 Implemented
MA0624 # 05 Y:2007 05 2007 IMPROVE COMBUSTION CONTROL CAPABILITY $12,255 $75,000 Implemented