IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

176

matching recommendations
Reset
NAICS 33592 Communication and Energy Wire and Cable Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0488 # 05 Y:2013 05 2013 RECOVER WASTE HEAT FROM EQUIPMENT $5,111 $1,500 Not Implemented
NC0488 # 06 Y:2013 06 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $323 $600 Implemented
NC0488 # 07 Y:2013 07 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,980 $19,622 Implemented
NC0488 # 08 Y:2013 08 2013 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $496 $0 Not Implemented
MA0705 # 01 Y:2013 01 2013 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $8,642 $200 Not Implemented
MA0705 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,284 $19,400 Implemented
MA0705 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,053 $2,800 Implemented
MA0705 # 04 Y:2013 04 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,037 $8,350 Not Implemented
MA0705 # 05 Y:2013 05 2013 OPTIMIZE PLANT POWER FACTOR $3,939 $13,700 Implemented
MA0705 # 06 Y:2013 06 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,632 $4,231 Not Implemented
MA0705 # 07 Y:2013 07 2013 PAY UTILITY BILLS ON TIME $1,191 $500 Implemented
MA0705 # 08 Y:2013 08 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $244 $497 Not Implemented
MA0674 # 01 Y:2011 01 2011 UTILIZE A LESS EXPENSIVE COOLING METHOD $11,498 $17,900 Not Implemented
MA0674 # 02 Y:2011 02 2011 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $6,531 $19,965 Not Implemented
MA0674 # 03 Y:2011 03 2011 REDUCE VENTILATION AIR $2,652 $1,200 Not Implemented
MA0674 # 04 Y:2011 04 2011 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,323 $14,500 Not Implemented
MA0674 # 05 Y:2011 05 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $941 $6,225 Not Implemented
MA0674 # 06 Y:2011 06 2011 INSTALL OCCUPANCY SENSORS $670 $2,150 Not Implemented
MA0674 # 07 Y:2011 07 2011 INSULATE BARE EQUIPMENT $434 $1,400 Not Implemented
MS0355 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,176 $44,540 Not Implemented
MS0355 # 02 Y:2010 02 2010 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $10,766 $6,978 Not Implemented
MS0355 # 03 Y:2010 03 2010 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $7,078 $32,037 Not Implemented
MS0355 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,361 $32,037 Not Implemented
MS0355 # 05 Y:2010 05 2010 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,377 $59,145 Not Implemented
MS0355 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $793 $6,281 Not Implemented