IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

56

matching recommendations
Reset
NAICS 335921 Fiber Optic Cable Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0261 # 01 Y:2021 01 2021 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $188,912 $733,702 Implemented
TT0261 # 09 Y:2021 09 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $703 $850 Not Implemented
TT0261 # 08 Y:2021 08 2021 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,221 $9,600 Not Implemented
TT0261 # 07 Y:2021 07 2021 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,374 $0 Implemented
TT0261 # 06 Y:2021 06 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,718 $15,000 Not Implemented
TT0261 # 05 Y:2021 05 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,133 $3,000 Not Implemented
TT0261 # 04 Y:2021 04 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $26,082 $700 Implemented
TT0261 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $49,358 $3,200 Implemented
TT0261 # 03 Y:2021 03 2021 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $30,912 $38,200 Not Implemented
NC0575 # 04 Y:2016 04 2016 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $750 $475 Implemented
NC0575 # 06 Y:2016 06 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $158 $300 Not Implemented
NC0575 # 02 Y:2016 02 2016 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $4,087 $100 Implemented
NC0575 # 05 Y:2016 05 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $338 $100 Not Implemented
NC0575 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,862 $21,540 Not Implemented
NC0575 # 01 Y:2016 01 2016 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $7,250 $500 Implemented
NC0571 # 09 Y:2016 09 2016 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,454 $200 Not Implemented
NC0571 # 10 Y:2016 10 2016 DEVELOP A REPAIR/REPLACE POLICY $3,097 $5,685 Not Implemented
NC0571 # 07 Y:2016 07 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,705 $200 Not Implemented
NC0571 # 08 Y:2016 08 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $12,346 $12,000 Not Implemented
NC0571 # 06 Y:2016 06 2016 INSTALL OCCUPANCY SENSORS $2,140 $2,603 Not Implemented
NC0571 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,882 $16,830 Not Implemented
NC0571 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,239 $20,540 Not Implemented
NC0571 # 01 Y:2016 01 2016 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $59,225 $500 Not Implemented
NC0571 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,338 $11,069 Not Implemented
NC0571 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $57,529 $69,600 Not Implemented