IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

32

matching recommendations
Reset
NAICS 335921 Fiber Optic Cable Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0575 # 06 Y:2016 06 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $158 $300 Not Implemented
NC0575 # 05 Y:2016 05 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $338 $100 Not Implemented
NC0575 # 04 Y:2016 04 2016 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $750 $475 Implemented
NC0575 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,862 $21,540 Not Implemented
NC0575 # 02 Y:2016 02 2016 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $4,087 $100 Implemented
NC0575 # 01 Y:2016 01 2016 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $7,250 $500 Implemented
NC0571 # 01 Y:2016 01 2016 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $59,225 $500 Not Implemented
NC0571 # 10 Y:2016 10 2016 DEVELOP A REPAIR/REPLACE POLICY $3,097 $5,685 Not Implemented
NC0571 # 09 Y:2016 09 2016 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,454 $200 Not Implemented
NC0571 # 08 Y:2016 08 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $12,346 $12,000 Not Implemented
NC0571 # 07 Y:2016 07 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,705 $200 Not Implemented
NC0571 # 06 Y:2016 06 2016 INSTALL OCCUPANCY SENSORS $2,140 $2,603 Not Implemented
NC0571 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,338 $11,069 Not Implemented
NC0571 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,882 $16,830 Not Implemented
NC0571 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,239 $20,540 Not Implemented
NC0571 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $57,529 $69,600 Not Implemented
NC0371 # 11 Y:2008 11 2008 DEVELOP A REPAIR/REPLACE POLICY $5,688 $13,149 Not Implemented
NC0371 # 10 Y:2008 10 2008 ADOPT IN-HOUSE MATERIAL GENERATION $28,534 $85,000 Not Implemented
NC0371 # 09 Y:2008 09 2008 INSULATE BARE EQUIPMENT $288 $485 Implemented
NC0371 # 08 Y:2008 08 2008 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $998 $0 Not Implemented
NC0371 # 07 Y:2008 07 2008 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $2,143 $10,000 Not Implemented
NC0371 # 06 Y:2008 06 2008 RECOVER WASTE HEAT FROM EQUIPMENT $3,037 $2,000 Not Implemented
NC0371 # 05 Y:2008 05 2008 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $2,415 $2,000 Not Implemented
NC0371 # 04 Y:2008 04 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,923 $4,350 Not Implemented
NC0371 # 03 Y:2008 03 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $15,277 $17,280 Implemented