IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

290

matching recommendations
Reset
NAICS 33593 Wiring Device Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NT0013 # 07 Y:2023 07 2023 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $720,000 $120,000 n/a
NT0013 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,755 $21,512 n/a
NT0013 # 03 Y:2023 03 2023 OPTIMIZE PLANT POWER FACTOR $10,076 $5,043 n/a
NT0013 # 01 Y:2023 01 2023 UPGRADE CONTROLS ON COMPRESSORS $71,747 $106,919 n/a
NT0013 # 06 Y:2023 06 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,102 $0 n/a
NT0013 # 04 Y:2023 04 2023 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $49,000 $83,421 n/a
NT0013 # 05 Y:2023 05 2023 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $17,430 $54,000 n/a
KS2312 # 07 Y:2023 07 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $53,134 $373,105 Not Implemented
KS2312 # 06 Y:2023 06 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $8,286 $62,649 Implemented
KS2312 # 05 Y:2023 05 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $80 $89 Not Implemented
KS2312 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,944 $5,480 Implemented
KS2312 # 03 Y:2023 03 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,204 $0 Implemented
KS2312 # 02 Y:2023 02 2023 ISOLATE HOT OR COLD EQUIPMENT $3,369 $3,164 Not Implemented
KS2312 # 01 Y:2023 01 2023 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $20,360 $1,600 Implemented
MU0007 # 05 Y:2022 05 2022 INSTALL SET-BACK TIMERS $612 $541 Not Implemented
MU0007 # 01 Y:2022 01 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,417 $10,160 Implemented
MU0007 # 06 Y:2022 06 2022 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $12 $44 Implemented
MU0007 # 04 Y:2022 04 2022 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $1,004 $0 Implemented
MU0007 # 02 Y:2022 02 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,200 $7,825 Not Implemented
MU0007 # 03 Y:2022 03 2022 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,914 $0 Implemented
NC0662 # 05 Y:2021 05 2021 INSTALL OCCUPANCY SENSORS $64 $280 n/a
NC0662 # 07 Y:2021 07 2021 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $78,648 $250,000 n/a
NC0662 # 06 Y:2021 06 2021 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $19,234 $75,000 n/a
NC0662 # 02 Y:2021 02 2021 RECOVER WASTE HEAT FROM EQUIPMENT $4,792 $5,472 n/a
NC0662 # 01 Y:2021 01 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,757 $2,000 n/a