IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

301

matching recommendations
Reset
NAICS 33593 Wiring Device Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MU0007 # 05 Y:2022 05 2022 INSTALL SET-BACK TIMERS $612 $541 Not Implemented
MU0007 # 06 Y:2022 06 2022 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $12 $44 Implemented
MU0007 # 02 Y:2022 02 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,200 $7,825 Not Implemented
MU0007 # 04 Y:2022 04 2022 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $1,004 $0 Implemented
MU0007 # 03 Y:2022 03 2022 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,914 $0 Implemented
MU0007 # 01 Y:2022 01 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,417 $10,160 Implemented
NC0662 # 03 Y:2021 03 2021 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $10,634 $39,970 n/a
NC0662 # 02 Y:2021 02 2021 RECOVER WASTE HEAT FROM EQUIPMENT $4,792 $5,472 n/a
NC0662 # 05 Y:2021 05 2021 INSTALL OCCUPANCY SENSORS $64 $280 n/a
NC0662 # 01 Y:2021 01 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,757 $2,000 n/a
NC0662 # 04 Y:2021 04 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,566 $3,150 n/a
NC0662 # 07 Y:2021 07 2021 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $78,648 $250,000 n/a
NC0662 # 06 Y:2021 06 2021 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $19,234 $75,000 n/a
MA0824 # 05 Y:2020 05 2020 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $1,491 $6,300 Implemented
MA0824 # 02 Y:2020 02 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $10,379 $54,695 Not Implemented
MA0824 # 01 Y:2020 01 2020 REPLACE BOILER $15,999 $29,000 Not Implemented
MA0824 # 04 Y:2020 04 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,118 $7,710 Implemented
MA0824 # 03 Y:2020 03 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,177 $29,750 Implemented
OK1029 # 02 Y:2020 02 2020 TURN OFF EQUIPMENT WHEN NOT IN USE $4,512 $0 Not Implemented
OK1029 # 01 Y:2020 01 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,568 $2,250 Implemented
OK1029 # 05 Y:2020 05 2020 TURN OFF EQUIPMENT WHEN NOT IN USE $546 $522 Not Implemented
OK1029 # 03 Y:2020 03 2020 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $4,684 $22,100 Implemented
OK1029 # 04 Y:2020 04 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,197 $30,672 Implemented
LE0483 # 05 Y:2019 05 2019 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $4,574 $20,000 Implemented
LE0483 # 04 Y:2019 04 2019 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $5,605 $12,900 Not Implemented