IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
Reset
NAICS 335931 Current-Carrying Wiring Device Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0357 # 08 Y:2019 08 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $996 $2,040 Implemented
MI0357 # 07 Y:2019 07 2019 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $1,267 $1,195 Implemented
MI0357 # 06 Y:2019 06 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,575 $160 Implemented
MI0357 # 05 Y:2019 05 2019 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $3,870 $8,000 Implemented
MI0357 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,689 $1,980 Implemented
MI0357 # 01 Y:2019 01 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $18,306 $3,600 Implemented
MI0215 # 05 Y:2012 05 2012 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,815 $1,300 Implemented
MI0215 # 01 Y:2012 01 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $15,517 $8,000 Implemented
MI0116 # 07 Y:2005 07 2005 PAY BILLS ON TIME TO AVOID LATE FEES $1,267 $0 Implemented
MI0116 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,648 $1,074 Implemented
MI0116 # 01 Y:2005 01 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,754 $2,512 Implemented
MI0094 # 09 Y:2004 09 2004 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $47,623 $4,110 Implemented
MI0094 # 08 Y:2004 08 2004 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $69,699 $5,966 Implemented
MI0094 # 07 Y:2004 07 2004 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $11,093 $2,056 Implemented
MI0094 # 04 Y:2004 04 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $9,418 $92 Implemented
MI0094 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $-177 $590 Implemented
MI0094 # 02 Y:2004 02 2004 REDUCE DEFECTS BY REDUCING PRODUCT TIPPING $95,473 $150 Implemented
MI0094 # 01 Y:2004 01 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $24,368 $2,300 Implemented
MI0093 # 08 Y:2004 08 2004 INSTALL ROTATING CAROUSELS TO REDUCE SET-UP TIMES $23,333 $21,000 Implemented
MI0093 # 07 Y:2004 07 2004 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $8,755 $510 Implemented
MI0075 # 02 Y:2004 02 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $1,540 $1,300 Implemented
MI0075 # 05 Y:2004 05 2004 CLEAR AND RENT EXISTING SPACE $42,330 $1,600 Implemented
MI0075 # 04 Y:2004 04 2004 CLEAR AND RENT EXISTING SPACE $124,576 $9,800 Implemented
MI0075 # 03 Y:2004 03 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $2,940 $0 Implemented